Laserfiche WebLink
CHAPTER 8. ACTION PLAN APPENDIX B. PARK ACCESS ANALYSIS <br />Presents a short-term action plan, prioritization Presents the mapping analysis of park gaps and <br />criteria and potential funding strategies. high -need areas. <br />rc <br />- -.. "Y:i ., ":� <br />APPENDIX A. PARK AND FACILITY <br />INVENTORY <br />Summarizes and classifies existing park and <br />facility data. <br />APPENDIX C. SITE RECOMMENDATIONS <br />Provides a matrix that summarizes <br />recommendations for all existing and propose <br />parks. <br />• <br />APPENDIX D. ACQUISITION, DESIGN AND <br />DEVELOPMENT GUIDELINES <br />Presents guidelines for the acquisition, design, <br />development, and renovation of parkland systemwide. <br />Win. .� <br />APPENDIX E. CAPITAL AND OPERATIONS °+, ;. ,, Y; <br />COSTS <br />Summarizes planning -level costs to carry out recommended <br />capital projects and maintain the park system. — �+ <br />24 <br />