My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2022-05-17
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
05/17/2022 Special and Regular
>
Agenda Packet_2022-05-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2022 3:10:44 PM
Creation date
5/16/2022 2:16:05 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
5/17/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1584
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT 3 <br />\WvX altonons[ruc[ion Inc."M� <br />WESTVIEW SCOPES OF WORK <br />2-410 DEMOLITION: <br />Demolition: concrete slabs, asphalt paving and base, sidewalk on Huron, corner curb, section of CMU wall & footing. <br />2-820 ABATEMENT: <br />Abatement. N/A <br />3-010 SEALED OR POLISHED CONCRETE: <br />Sealed Concrete at around floor, trash and utility rooms. <br />3-300 CONCRETE: <br />Building foundations, continuous footings, pads, (2) elevator pits walls, slab on grade, over a 2" layer of sand over 15 Mil Vapor <br />Barrier over 2" layer of sand. <br />31-310 SOIL TREATMENT: <br />Soil treatment. <br />3-540 CELLULAR CONCRETE: <br />1- 1/4" Gyp -Crete lightweight underlayment over 1/4" acoustic -mat sound mat throughout units on 2nd & 4th floor over plywood, <br />with 1/8" perimeter isolator strips <br />1- 1/4" Gyp -Crete lightweight underlayment over 1/4" acoustic -mat sound mat at common rooms on 2nd & 4th floor over plywood, <br />with 1/8" perimeter isolator strips <br />2-1/2" Hardrock concrete at 2nd - 4th floor corridors and walkways. <br />4-220 MASONRY: <br />Building masonry, N/A <br />Site walls - see line 32-320 <br />CTRTTCTTTRAT./MTCC RTFFT.- <br />5-100 <br />Structural steel, Allowance <br />5-510 <br />Stairs #1, #2, & #3, w/ recast riser/treads, stair guardrail, wall mount single handrail. <br />5-521 <br />2 elevator pit ladders, hoist beams and roof ladder. <br />42" high unit balcony guardrails with wood slats. <br />6-100 ROUGH CARPENTRY: <br />Framing per plans and specs, Added (3) balconies and decorative parapet element. (Reduced lumber to current pricing). <br />Horizontal siding. <br />Wood/Metal screen. <br />6-200 FINISH CARPENTRY: <br />Baseboards <br />Closet shelf and pole. <br />Unit bath accessories. <br />6-410 CABINETS: <br />Euro Frameless, Unit kitchens and baths, 'Diva' Textured thermofoil flat face edge banded door and drawer fronts, 100 pound Grass <br />Metabox drawer system, woodgrain melamine interiors, self closing concealed hinges, side mount euro white drawer glides, 6" wire <br />pulls, breadboards. <br />Common areas, Community room kitchen. <br />7-000 CAULKING: <br />7-100 WATERPROOFING: <br />(2) Elevator pits. <br />7-140 DECK COATINGS: <br />Westcoat pedestrian deck coating ALX system at 2nd - 4th floor unit balconies over plywood. <br />Westcoat pedestrian deck coating ALX system at (2) 4th floor outdoor decks over plywood. <br />7-200 THERMAL INSULATION: <br />Buildine insulation. unfaced fiberelass batts. T-24 Infiltration caulkine and OII included. <br />7-511 I ROOFING: <br />Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.