My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2022-05-17
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
05/17/2022 Special and Regular
>
Agenda Packet_2022-05-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2022 3:10:44 PM
Creation date
5/16/2022 2:16:05 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
5/17/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1584
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT 3 <br />CSI # <br />DESCRIPTION <br />31-250 <br />Erosion control <br />Traffic Control <br />Contract Compliance <br />35-206 <br />Miscellaneous site labor <br />35-207 <br />Miscellaneous site equipment <br />35-208 <br />Cleanup / Dumpsters / Final Clean Up <br />35-209 <br />Security 10 months <br />35-441 <br />Air Pollution / Dust Control <br />43-027 <br />Surveyor / Stake <br />SITE UTILITIES: <br />33-100 <br />4" Domestic Water, 2" Irrigation water services, w/backflows <br />8" Fire water w/backflows and (2) new on -site fire hydrants. <br />33-300 <br />Sanitary Sewer,(1) 8" SDR PVC sewer laterals from POC (tap to main) in street to P/L add sewer laterals from P/L to building w <br />clean out in yard box. <br />33-400 <br />Storm Drainage, catch basins, atrium drains, area drains and roof drains area drains connection with all piping to storm water <br />system. Diversion structure, Rect. overflow piping and curb drains w/transition fitting, ADS Stormtech MC-4500 system detention <br />33-510 <br />Gas lines up to meter, trenching for Gas Co. <br />33-700 <br />Dry utility, Allowance. <br />Gray Water System. N/A <br />CONCRETE PAVING: <br />32-131 <br />Concrete Paving: <br />Off -Site City sidewalk. <br />Off -Site City curb and gutter. <br />On -Site, pedestrian walkway, rebar and compact base. <br />32-161 <br />On -Site parking area landscape curbs. <br />On -Site 3' wide concrete swale/gutter. <br />ASPHALT PAVING: <br />32-121 <br />AC Paving: <br />Off -site asphalt paving, 8" full depth AC slot patch T wide.. <br />On -site asphalt paving, 6" asphalt over 9" Class II compacted base at parking area. <br />32-172 <br />On -site striping, standard ADA parking stalls w/stencil, standard parking stalls, install & post ADA signage, cross hatching. <br />SITE IMPROVEMENTS: <br />32-3 10 <br />Site fences and gates 6' H and play area fence 42" H. <br />32-320 <br />New CMU Perimeter screen wall 6' high w/footing. <br />LANDSCAPING: <br />32-900 <br />Building planting, trees and shrubs <br />Building Irrigation <br />Building 90 Day Maintenance Period <br />Turf at lawn area. <br />City Council <br />Page 4 <br />39 — 79 5/17/2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.