My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2022-05-17
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
05/17/2022 Special and Regular
>
Agenda Packet_2022-05-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2022 3:10:44 PM
Creation date
5/16/2022 2:16:05 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
5/17/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1584
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Public Works Agency <br />www.santa-ana.org/pw <br />Item # 16 <br />City of Santa Ana <br />20 Civic Center Plaza, Santa Ana, CA 92701 <br />Staff Report <br />May 17, 2022 <br />TOPIC: Sidewalk Concrete Repairs Project <br />AGENDA TITLE <br />Approve the Second Amendment to the Construction Contract with CJ Concrete <br />Construction, Inc., to Increase the Contract Amount by $2,000,000 to Perform Additional <br />Concrete Repairs through the End of Project Completion (Project No.22-6970) (General <br />and Non -General Fund) <br />RECOMMENDED ACTION <br />1. Authorize the City Manager to approve the second amendment to the construction <br />contract with CJ Concrete Construction, Inc., by an increase of $2,000,000, to <br />perform additional concrete improvements through the end of project completion, for <br />a new estimated project delivery cost of $3,700,000. <br />2. Approve the revised Project Cost Analysis increasing Construction Administration, <br />Inspection, and Testing by $50,000 and the project contingencies by $1,950,000, for <br />a new estimated project delivery cost of $3,700,000. <br />DISCUSSION <br />The Public Works Agency's Maintenance Services Division is responsible for maintaining <br />400 miles of streets and 800 miles of sidewalks located within the City of Santa Ana. Staff <br />evaluates the condition of damaged sidewalks, curbs, gutters, and driveways to identify <br />uneven surfaces and cracks that may pose a risk to pedestrians. The goal is to improve <br />safe walking accessibility for pedestrians and increase active modes of transportation, <br />such as walking and biking. Additionally, this reduces the potential of liability claims and <br />assists in complying with regulations set forth by the American with Disabilities Act. <br />Procedures to mitigate these conditions include offset grinding, temporary asphalt <br />ramping, and removal/replacement of damaged concrete areas. <br />On November 16, 2021, the City Council awarded a contract to CJ Concrete Construction, <br />Inc., for various concrete repair projects involving the repair of damaged sidewalks, curbs, <br />gutters, driveway approaches, and curb ramps. Prioritization of work is focused on areas <br />with the highest concentration of needed repairs (Exhibit 1). Projects have been <br />completed or are underway in each of the City's six wards, including Riverview West <br />(Ward 1), New Horizons (Ward 2), Pacific Park (Ward 2), West Floral Park (Ward 3), <br />City Council 16-1 5/17/2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.