Laserfiche WebLink
Exhibit 1 <br />DAKTRONICS QUOTE # 622653-2-2 MAIN <br />ATTACHMENT A <br />1) Accept, lift, unload, and inspect all Equipment and control equipment from carrier. <br />2) Lift and mount Equipment listed in this quotation. <br />QUALIFICATIONS/CLARIFICATIONS <br />1) Access: Daktronics requires unobstructed access to Equipment and control room installation site until display <br />is 100%. Installation equipment (cranes, lifts, trucks, concrete trucks, etc.) are expected to have access <br />directly to the scoreboard/structure location. No concrete pumping, concrete buggies, or crane picks over <br />10' distance from scoreboard structure are included. <br />2) Control Room Climate: Normal operating temperature should be between 400 to 900 Fahrenheit (40 to 320 <br />Celsius). Normal operating humidity should be less than 80% non -condensing. Storage temperature should be <br />between -100 to 1050 Fahrenheit (-230 to 41 ° Celsius). Storage humidity should be less than 95% non - <br />condensing. Keep computers and monitors out of direct sunlight during storage. Allow control equipment <br />taken out of storage to return to operating temperature range prior to turning it on (24 hours recommended). <br />3) Electrical: The maximum voltage is 120 volts line to neutral for all Equipment in this quotation. <br />4) Building Penetrations: Customer to provide all required building (wall/roof) penetrations for the installation of <br />Daktronics provided wireless bridge and/or scoring console radio transmitter components at the control <br />location. Mount Daktronics provided wireless bridge and/or scoring console radio transmitter components to <br />the building in accordance with manufacturers recommendations. Building penetration location shall <br />provide clear line -of -sight to the Equipment. Provide all conduit, with pull string, from control location <br />equipment to the building penetration location. <br />5) Existing Conduit: Costs to repair or replace damaged or obstructed conduit have not been included in this <br />quote. <br />6) Prevailing Wage: The install price accounts for prevailing wages. <br />City Council <br />20 — 13 5/17/2022 <br />Attachment A Page 2 of 2 <br />