My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2022-05-17
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
05/17/2022 Special and Regular
>
Agenda Packet_2022-05-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2022 3:10:44 PM
Creation date
5/16/2022 2:16:05 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
5/17/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1584
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(U"; �i t e d' <br />SITE SERVICES <br />1-800-TOILETS / UnitedSiteServices.com <br />City of Santa Ana, CA <br />On -Call Chain Link Fencing — Various Sites <br />RFP#i 21-123 <br />Concerns/Exceptions: <br />1. Please note pricing provided on price sheet doesn't include prevailing wage. All costs MUST add <br />$63.13 per man hour, with 2 technicians per delivery, on all work, including installs, moves, pick ups, <br />etc. <br />2. Page 12 — "All fencing shall include "City Owned Property —Do Not Trespass" signage to allow for <br />enforcement on the site." <br />USS cannot accommodate this request. <br />3. Page 12 —"The term of these contracts shall be for three years with two one year renewal options <br />upon mutual agreement. All pricing shall remain firm during the initial one-year term." <br />i. USS can hold pricing firm for the first year. Following years will be subject to a <br />price increase. <br />4. Page 17 —"The Contractor is required to provide a twenty-four (24) hour response time for all fence <br />requests, Twenty-four hour response means fencing shall be in place within twenty-four hours from <br />the time a request is made Monday through Friday. Most requests will not require a twenty-four <br />hour response, however the contractor is required to provide this service upon request at no <br />additional charge." <br />i. USS can accommodate a 24 hour response time for up to 700' of 6' fence <br />(please note emergency fee will apply). If the footage of fence needed is more <br />than that it will require additional time as additional trucks would be required. <br />5. Page 17 —"Pricing must be inclusive of all costs, including but not limited to, direct and indirect costs <br />for labor, overhead, incidental supplies, hardware, screws, bolts, welding material, paint, wires, <br />disposal of materials, traffic control, assembly materials and travel for installation and removal." <br />i. USS doesn't provide welding material, paint, wires, or traffic control. <br />• � •.: . � ,. fib..,, _ �; <br />
The URL can be used to link to this page
Your browser does not support the video tag.