Laserfiche WebLink
FINAL DRAFT PRELIMINARY REPORT <br />(Connections to EOCF #2) <br />• If property acquisition is recommended, identify the needed property, and include a ball park cost of the <br />property. <br />• For the recommended alternatives, prepare conceptual site layouts of the facilities, including meter and <br />valving, conceptual alignment of any conveyance infrastructure, and estimate the probable construction <br />costs for the facility, the conveyance piping and any land acquisition needed. <br />• A technical paper summarizing the evaluation and findings will be prepared. Within the appendix will be <br />the preliminary locations identified, all of the backup calculations and supporting documentation. <br />• Presentations will be made to each of the OCWD and MNWD respective boards. <br />• Review similar work the Municipal Water District of Orange County is performing regarding pumping <br />groundwater into the East Orange County Feeder No. 2. <br />• Coordinate the work with the possible transmission of Poseidon Resources Ocean Desalination water to <br />South Orange County via the East Orange County Feeder No. 2. <br />Future work will need to be completed to evaluate the hydraulic constraints of regional infrastructure as well as <br />possible water quality impacts. The above study does not contemplate those work products. <br />1.3 Metropolitan Water District's Policy Regarding Deliveries in an Emergency <br />Administrative Code amendments have been approved by Metropolitan Water District to enable deliveries of <br />member agency water supplies in Metropolitan's system in an emergency. These deliveries are intended to <br />provide Metropolitan's member agencies the ability to deliver member agency water through Metropolitan's <br />system under specific emergency conditions. Emergency deliveries can only be made if Metropolitan is unable to <br />make deliveries to a member agency due to physical damage to Metropolitan's system resulting from a natural <br />disaster or other emergency, and there are no alternate means for Metropolitan or the member agency to provide <br />service to an area without the use of a portion of Metropolitan's system. <br />1.4 Joint Ownership of East Orange County Feeder No. 2 <br />East Orange County Feeder No. 2 ownership is: MWDOC 58.5%; MWD 31.7%; Anaheim 3.3%; and Santa Ana 6.5%. <br />MWDOC's share is split among thirteen (13) agencies. Any use of the East Orange County Feeder No. 2 to convey <br />emergency water would need to be approved by downstream agencies. <br />Orange 9t9%9 1District/Moulton Niguel Water District 30 - 14 5/17/2tIMA TECH <br />Evaluation of Groundwater Conveyance Options <br />