My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MGT OF AMERICA CONSULTING
Clerk
>
Contracts / Agreements
>
M
>
MGT OF AMERICA CONSULTING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2022 10:20:34 AM
Creation date
5/19/2022 10:18:59 AM
Metadata
Fields
Template:
Contracts
Company Name
MGT OF AMERICA CONSULTING
Contract #
A-2021-251
Agency
Public Works
Council Approval Date
12/21/2021
Expiration Date
4/30/2023
Insurance Exp Date
7/1/2022
Destruction Year
2028
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
documented and defensible Cost Allocation plan prepared annually that will identify rates that <br />can be used to recover billable hourly costs for services and develop usor fees that comply with <br />Proposition 218, <br />'om 4UBL"viges <br />Prepare the City's Full Cost Allocation plan for F'X 16/17; FY 17/18; and FX 18/19 (total cost <br />plan and an OMB 2 CFR Part 225 plan), which may incuudo the following elements (if the <br />consultant feels that additional tasks are warranted, they must be clearly identified in the <br />consultant's proposal): <br />A. Work and meet with selected City staff to refine the project scope, purpose, uses and <br />goals o£the City's Full Cost Allocation Plan to ensure that the study will be both accurate <br />and appropriate to the City's needs, Review project achedulo and answer any questions <br />pertaining to the sumeasful development of the study. <br />B. If necessary, meet with staff and conduct interviews as needed to gain an understanding <br />of the Public Work Ageuoy's processes and operations. This includes where certain <br />services and functions are performed together or shared through cooperation between <br />different divisions. Costs should be identified so that they can be allocated to and tracked <br />accordingly. <br />C, Identify the total cost of providing each City service at the appropriate activity level and <br />in a manner that is Consistent with all applicable laws, statutes, rules and regulations <br />governing the collection of fees, rates, and charges by public entities Including, but not <br />limited to, the State Controller's Office Guidelines for Cost Claiming and OM13 2 CFit <br />Part 225 standards, <br />D, Develop a Full Cost Allocation Model using budgeted and/or actual data for calculating <br />the fall costs of providing each City service. The requirements of the model should allow <br />for: <br />a, Additions, revisions, or removal of direct and overhead costs so that the full Cost <br />Allocation Plan can be easily adapted to a range of activities, both simple and <br />complex. <br />b. The ability of the City to continuously update the model and fall Cost Allocation <br />Plan from year to year as the organization changes. <br />e. The addition of hypothetical service area information for future service <br />enhancement's, and the ability to calotilate'the estimated Coats ofproviding the <br />service under consideration (i.e. ad -hoc analysis), <br />E. Report on other matters that come to your attention in the course of your evaluation that <br />in your professional opinion. the City should consider. <br />F. Present the plan to the City's management group and make necessary adjustments as <br />requested. <br />G. Prepare and deliver presentations (as needed) to the Council to facilitate their <br />understanding of the plan and its implications to the City. <br />1.1, Provide the City with an electronic copy of the final comprehensive review, including <br />related schedules and cost documentation in a format such as Mierosoil Word and <br />Clty of Santa Ana RFP 18.023 <br />Page Al-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.