My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TETRA TECH, INC. (6)
Clerk
>
Contracts / Agreements
>
T
>
TETRA TECH, INC. (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 9:52:52 AM
Creation date
5/24/2022 3:15:54 PM
Metadata
Fields
Template:
Contracts
Company Name
TETRA TECH, INC.
Contract #
A-2022-070
Agency
Public Works
Council Approval Date
5/17/2022
Expiration Date
5/16/2025
Insurance Exp Date
10/1/2024
Destruction Year
2030
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />RFP NO.: 21-127 <br />SA-2 PRESSURE CONTROL STATION RELOCATION AND TRANSMISSION MAIN <br />IMPROVEMENTS <br />electric generation in this manner. Provide locations for possible battery <br />storage units as well as size and footprint for said units. <br />4. Prepare preliminary electrical and control system design plans for hydro - <br />turbine generator and related appurtenances. The Consultant shall also <br />evaluate the existing standard operating procedures for the existing <br />pressure reducing station, make recommendations to modify how the <br />station operates at a control system level and SCADA level, and provide <br />preliminary control panel designs in accordance with the City's panel build <br />guidelines and the description below. This shall also include an electrical <br />operational plan and control scheme. <br />CONTROL SYSTEM DESIGN <br />The Consultant shall, be required to provide full control panel designs for <br />the hydrogenerator, control valve operations and site operations. Control <br />panel designs shall contain fully engineered diagrams that specify all <br />equipment, backpanels, terminal blocks, special components and related <br />items. Also included in the design shall be all control wiring diagrams, <br />specific 1/0, panel elevations, item and quantity lists with specific part <br />numbers. Control system design programmers allowed are as follows: <br />Enterprise Automation <br />210 Goddard <br />Irvine, CA 92618 <br />Scott Pickford — Owner <br />949-769-6000 <br />KDC Systems <br />4462 Corporate Center Drive <br />Los Alamitos, CA 90720 <br />Lukasz Niedojadlo — Project Manager <br />714-236-2209 <br />Industrial Control Systems Online <br />P.O. Box 381 <br />Ripon, CA 95366 <br />Steve Scrosati — CEO <br />209-599-9775 <br />ADDITIONAL RELATED DUTIES THAT MAY BE ASSIGNED: <br />A. The Consultant will be required to design and develop tagging <br />standards. Tagging should include information both on physical <br />devices, instruments, equipment, PLCs, control cabinets, as well as <br />tagging within the historian and data warehouse. <br />Page 5 of I I <br />
The URL can be used to link to this page
Your browser does not support the video tag.