My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TETRA TECH, INC. (6)
Clerk
>
Contracts / Agreements
>
T
>
TETRA TECH, INC. (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 9:52:52 AM
Creation date
5/24/2022 3:15:54 PM
Metadata
Fields
Template:
Contracts
Company Name
TETRA TECH, INC.
Contract #
A-2022-070
Agency
Public Works
Council Approval Date
5/17/2022
Expiration Date
5/16/2025
Insurance Exp Date
10/1/2024
Destruction Year
2030
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />RFP NO.: 21-127 <br />SA-2 PRESSURE CONTROL STATION RELOCATION AND TRANSMISSION MAIN <br />IMPROVEMENTS <br />column in the matrix will outline any action taken by the Consultant in resolving <br />the comment. This spreadsheet will be submitted to all reviewers prior to and as <br />part of the Final PS&E submittal. If needed, the Consultant shall schedule <br />review meetings with key reviewers to clarify any comments and resolve any <br />conflicting comments. <br />All comments from the 100% review will be addressed and where required will <br />be incorporated into the Final PS&E's. The Final PS&E submittal shall include a <br />complete set of improvement plans including all disciplines, all detail sheets and <br />shall be signed by a registered engineer in the State of California for each <br />discipline. The Final Specifications/Bid Documents submittal shall be a <br />complete package with all sections of the standard City bid documents included <br />and will have listed all bid items in the standard form. The Final Engineer's <br />estimate of Probable Costs shall be complete including final quantities, unit <br />prices, carried totals for each bid item, a grand total for the Project. One (1) <br />hard copies of full size (36x24) plan sets, Two (2) hard copies of half size <br />(11 x17) plan sets, one (1) electronic copy of the final PS&E's shall be delivered <br />to the Project Manager. <br />The Consultant shall be responsible for addressing any final comments to the <br />plans, specifications and engineer's estimate of probable costs based on input <br />from the Project Manager prior to going to bid. <br />Task 9. Bidding & Construction Phase Services <br />Throughout the bidding and construction process, the Consultant shall be <br />required to assist the Project Manager in the following items: <br />a. Assist in responding to questions raised during the bidding process <br />including preparation of any addenda. <br />b. Attend the pre -construction meeting and construction kick-off meeting. <br />C. Respond in writing to any contractor's questions (RFI's) during <br />construction. Assume a total of twenty-five (25) RFI's for purposes of this <br />proposal. Assume that ten (10) will require design sketches or exhibits. <br />d. Attend site visits to clarify design issues in the field as required by City <br />staff. Assume a total of twenty (20) hours for site visits and construction <br />meetings. <br />e. Collect and compile all equipment and product information provided by the <br />Contractor and incorporate into an Operations and Maintenance manual. <br />The manual will include the specifications, maintenance recommendations <br />and warranty information. <br />Page 9 of 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.