Laserfiche WebLink
EXHIBIT A SCOPE OF WORK <br />Task 5 Bid Advertisement, Construction Administration, Record Drawings: <br />Bid and Award 4 months <br />Construction Administration 12 months <br />Record Drawings 2 months <br />FFE Design intent and bid package — concurrent with Task 5 <br />Signage Design Intent and bid package — concurrent with Task 5 <br />LB The schedule for the project overall or any phase(s) may be adjusted upon mutual agreement of the <br />City and the Consultant to meet changing project needs. <br />EXHIBIT A Page Al-12 <br />