My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AGA ENGINEERS, INC.
Clerk
>
Contracts / Agreements
>
A
>
AGA ENGINEERS, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2022 9:15:29 AM
Creation date
6/8/2022 9:13:57 AM
Metadata
Fields
Template:
Contracts
Company Name
AGA ENGINEERS, INC.
Contract #
A-2021-210
Agency
Public Works
Council Approval Date
10/19/2021
Expiration Date
10/18/2023
Insurance Exp Date
7/1/2022
Destruction Year
2028
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Schedule <br />AGA's proposed project schedule, shown below, has been prepared considering all the <br />requirements for the study detailed in the RFP in estimating the time required to complete the <br />project. AGA has adequate staff resources to provide a Draft Report to the City of Santa Ana <br />within twelve to fourteen weeks from receipt of the notification to proceed, and a Final Report to <br />the City within two weeks of receipt of the written consolidated comments on the Draft Report. <br />Given the recently adopted changes in the California Vehicle Code relative to raising or lowering <br />speed limits, and the potential for questions relative to speed limit modifications resulting in the <br />need for multiple presentations at the Commission/Council level, our expedited Project <br />Schedule will allow adequate time for these presentations and ensure that the current extended <br />seven-year validity between speed surveys will not lapse. <br />AGA will coordinate with the City prior to data collection to ensure that no planned construction <br />work or other events will potentially impact the scheduled data collection. <br />Work Tasks <br />Task 0 — Project Management and Coordination <br />Task t — Vehicle Speed (Radar) Surveys <br />Task 2 — Speed Data Analysis <br />Task 3 — Roadway Segment Characteristics <br />Review <br />Task 4 — Accident History Review and Rate <br />Calculations <br />Task 5 — Segment Spot Speed Analysis <br />Tasks 6 & 7— Preparation of Draft 8 Final Report <br />Task 8 — Presentations (Maximum 5) <br />Task 9 — Sketches for Sign Changes (Optional) <br />LEGEND * Kick -Off Meeting <br />Months from Notice to Proceed <br />s s- <br />* <br />- Task Duration City Review * Submittal * Public Meetings <br />E•emo.:. m.. <br />Page 10 <br />