My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Packet_5-23-22
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2022
>
5-23-22
>
Packet_5-23-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2022 5:18:48 PM
Creation date
7/11/2022 5:17:56 PM
Metadata
Fields
Template:
PBA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA FY 22/23CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT DESCRIPTION: <br />The proposed improvements would include the widening of Fairview <br />Street with a cross section of 100' wide right-of-way and and will <br />include 3 lanes in each direction, raised median, Class II bike lane, <br />and 8' wide sidewalk with tree wells. Additionally, the proposed <br />improvements would entail widening of the Fairview Street Bridge, <br />relocation of existing utilities, including several power poles, street <br />lights, and partial acquisition of 2 parcels. <br />PROJECT NEED: <br />Fairview Street is currently a four-lane undivided arterial between 9th <br />Street and 16th Street. This segment of Fairview Street currently <br />carries 38,544 vehicles per day (VPD) and has a volume to capacity of <br />(V/C) ratio of 1.03. At this V/C ration, this roadway segment operates at <br />an unacceptable level of service. LOS F exists where the traffic stream <br />is extremely difficult. With the proposed improvements, this roadway <br />segment will improve to acceptable LOS B. <br />PROJECT TITLE: <br />Fairview Bridge and Street <br />Improvements <br />PROJECT CATEGORY: <br />Street Improvements <br />Street/Bridge Improvements & <br />Widening <br />LOCATION MAP <br />AGENCY:DIVISION:CONTACT: <br />Public Works CIP Engineering Kenny Nguyen, Senior Civil Engineer <br />PROJECT COSTS FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 <br />Right-Of-Way 200,000 ------ <br />TOTAL 200,000 ------ <br />SOURCE OF FUNDS FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 <br />GAS TAX 200,000 ------ <br />TOTAL 200,000 ------ <br />205/23/2022 <br />Planning Commission {{item.number}}–27
The URL can be used to link to this page
Your browser does not support the video tag.