Laserfiche WebLink
CITY OF SANTA ANA FY 22/23CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT DESCRIPTION: <br />This project entails the rehabilitation of existing roadway pavement <br />for local streets. The project will include the removal and <br />replacement of existing asphalt streets. Various replacement <br />pavement strategies will be investigated to determine the most cost <br />effective and maintainable treatment. Minor concrete repair to <br />severely damaged or missing curbs, gutters, sidewalks, and <br />wheelchair ramps will also be included. <br />PROJECT NEED: <br />The interior roadway of non-residential street has been identified as <br />priority by the City's Pavement Management System. The pavement is <br />deteriorating due to weather, age, and heavy usage. <br />PROJECT TITLE: <br />Non-Residential Street Repair <br />Program <br />PROJECT CATEGORY: <br />Street Improvements <br />Arterial Street Rehabilitation <br />LOCATION MAP <br />AGENCY:DIVISION:CONTACT: <br />Public Works CIP Engineering Kenny Nguyen, Senior Civil Engineer <br />PROJECT COSTS FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 <br />Engineering 2,266,660 ------ <br />TOTAL 2,266,660 ------ <br />SOURCE OF FUNDS FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 <br />REFUSE MAINTENANCE 2,266,660 ------ <br />TOTAL 2,266,660 ------ <br />275/23/2022 <br />Planning Commission {{item.number}}–34