Laserfiche WebLink
CITY OF SANTA ANA FY 22/23CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT DESCRIPTION: <br />This project entails the rehabilitation of existing roadway pavement <br />for local streets. The project will include the removal and <br />replacement of existing concrete streets. Various replacement <br />pavement strategies will be investigated to determine the most cost <br />effective and maintainable treatment. Minor concrete repair to <br />severely damaged or missing curbs, gutters, sidewalks, and <br />wheelchair ramps will also be included. Work in FY 22-23 will focus <br />on the Heninger Park Neighborhood. <br />PROJECT NEED: <br />The local street network has 316 miles citywide. In 2007 the City <br />embarked on an extensive citywide improvement plan to rehabilitate <br />and slurry seal the majority of the network. By the end of 2015, the City <br />has completed rehabilitating all asphalt residential streets and currently <br />working toward improving all residential concrete streets. <br />PROJECT TITLE: <br />Residential Street Repair Program- <br />Heninger Park <br />PROJECT CATEGORY: <br />Street Improvements <br />Neighborhood Street Rehabilitation <br />LOCATION MAP <br />AGENCY:DIVISION:CONTACT: <br />Public Works CIP Engineering Jason Gabriel, Principal Civil Engineer <br />PROJECT COSTS FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 <br />200,000 ------ <br />Construction 1,756,959 ------ <br />Engineering 140,000 ------ <br />TOTAL 2,096,959 ------ <br />SOURCE OF FUNDS FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 <br />CDBG Programs 1,896,959 ------ <br />TOTAL 1,896,959 ------ <br />305/23/2022 <br />Planning Commission {{item.number}}–37