My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Packet_5-23-22
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2022
>
5-23-22
>
Packet_5-23-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2022 5:18:48 PM
Creation date
7/11/2022 5:17:56 PM
Metadata
Fields
Template:
PBA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA FY 22/23CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT DESCRIPTION: <br />To provide inter-agency traffic signal coordination and infrastructure <br />upgrades on Euclid Street from La Habra Boulevard in City of La <br />Habra through the Cities of La Habra, Fullerton, Anaheim, Garden <br />Grove, Santa Ana and Fountain Valley to Interstate 405 in City of <br />Fountain Valley. The project involves the Cities of Santa Ana, La <br />Habra, Fullerton, Anaheim, Garden Grove and Fountain Valley. <br />PROJECT NEED: <br />OCTA Traffic Signal Synchronization Master Plan identified that Euclid <br />Boulevard Corridor is part of countywide corridor system that needs <br />multi-jurisdiction synchronization. This project will provide traffic signal <br />upgrades and synchronize traffic signals across jurisdictional <br />boundaries to reduce traffic congestion and maintain the <br />synchronization improvements for 3 years. <br />PROJECT TITLE: <br />Euclid Street Corridor Traffic Signal <br />Synchronization <br />PROJECT CATEGORY: <br />Traffic Improvements <br />Traffic Improvements <br />LOCATION MAP <br />AGENCY:DIVISION:CONTACT: <br />Public Works Traffic Engineering Cesar Rodriguez, Senior Civil Engineer <br />PROJECT COSTS FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 <br />Construction 110,000 ------ <br />Engineering 10,000 ------ <br />TOTAL 120,000 ------ <br />SOURCE OF FUNDS FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 <br />M2 LOCAL FAIRSHARE 120,000 ------ <br />TOTAL 120,000 ------ <br />375/23/2022 <br />Planning Commission {{item.number}}–44
The URL can be used to link to this page
Your browser does not support the video tag.