My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Packet_5-23-22
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2022
>
5-23-22
>
Packet_5-23-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2022 5:18:48 PM
Creation date
7/11/2022 5:17:56 PM
Metadata
Fields
Template:
PBA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA FY 22/23CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT DESCRIPTION: <br />This project will replace aging water distribution pipelines and <br />related appurtenances including fire hydrants and valves along <br />Standard Avenue from McFadden Avenue to First Street. <br />PROJECT NEED: <br />This project is required to maintain effective operation of the City's <br />water distribution system, replace obsolete water mains to ensure <br />system reliability, and protect water quality. <br />PROJECT TITLE: <br />Standard Avenue Water Main <br />Improvements <br />PROJECT CATEGORY: <br />Utility/Drainage/Lighting <br />Improvements <br />Water Improvements <br />LOCATION MAP <br />AGENCY:DIVISION:CONTACT: <br />Public Works Water Resources Robert Aguirre, Senior Civil Engineer <br />PROJECT COSTS FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 <br />Engineering 75,000 ------ <br />TOTAL 75,000 ------ <br />SOURCE OF FUNDS FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 <br />WATER CAPITAL 75,000 ------ <br />TOTAL 75,000 ------ <br />495/23/2022 <br />Planning Commission {{item.number}}–56
The URL can be used to link to this page
Your browser does not support the video tag.