My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Packet_6.27.22
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2022
>
6-27-22
>
Packet_6.27.22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2022 5:26:15 PM
Creation date
7/11/2022 5:23:11 PM
Metadata
Fields
Template:
PBA
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
444
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Total Building Size <br />(1,000 Square Foot) <br />Construction <br />Duration <br />(months) <br />Total Project <br />Construction <br />Power Cost <br />73.500 15 $2,557.80 <br />*Assumes the project will be under the GS-1 General Service rate under SCE. <br />Cost per kWh Total Project Construction Electricity Usage (kWh) <br />$0.11 23,253 <br />Table 23 <br />Project Construction Power Cost and Electricity Usage <br />Power Cost <br />(per 1,000 square foot of building per <br />month of construction) <br />$2.32 <br />Cabrillo at First Mixed-Use Residential Project <br />Air Quality, Global Climate Change, HRA and Energy Impact Analysis <br />19386986/27/2022 <br />Planning Commission 2 –151
The URL can be used to link to this page
Your browser does not support the video tag.