My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Packet_6.27.22
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2022
>
6-27-22
>
Packet_6.27.22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2022 5:26:15 PM
Creation date
7/11/2022 5:23:11 PM
Metadata
Fields
Template:
PBA
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
444
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
19386 Cabrillo at First Mixed UseEstimation of DPM Emissions Along the 5 FreewayCal Trans Vehicle Traffic - 20202 axle 3 axle 4+ AxleSegment Ahead AADTTotal Trucks LDA/LDT/MDT % LDA/LDT/MDT% Trucks 2 axle % Trucks 3 axle % Trucks 4+ axle % Trucks301600 21112 280488 93.0% 7.0% 9342 44.2% 2065 9.8% 9705 46.0%Diesel Vehicle Distribution Vehicle Mix2 axle trucks = LHDT1 and LHDT23 axle trucks = MHDT4+ axle trucks = HHDTAdjusted Fleet MixSCABCalEEMod AdjustedFleet Mix Fleet Mix Daily TripsLDA 54.48 59.2% 166103LDT1 5.89 6.4% 17946LDT2 18.69 20.3% 56985MDV 12.94 14.1% 39453Total 92.00 100.0% 280488LHD1 2.44 78.9% 7371LHD2 0.65 21.1% 1971Total 3.09 100.0% 9342MHDT2065HHDT9705Total - All Vehicles 301600Diesel Vehicle Distribution (from URBEMIS: 2023 in SCAQMD)Daily % Diesel Diesel VehiclesLDA 0.0% 0LDT1 1.4% 251LDT2 0.0% 0MDV 0.0% 0LHDT1 17.6% 1297LHDT2 40.0% 788MHDT 80.0% 1652HHDT 100.0% 9705Tustin, Jct. Route 55, Costa Mesa FreewayApx-606/27/2022Planning Commission 2 – 220
The URL can be used to link to this page
Your browser does not support the video tag.