Laserfiche WebLink
3.0 Construction Detail <br />2.3 Vegetation <br />CO2e <br />Category MT <br />New Trees 50.9760 <br />Total 50.9760 <br />Vegetation <br />Construction Phase <br />Phase <br />Number <br />Phase Name Phase Type Start Date End Date Num Days <br />Week <br />Num Days Phase Description <br />1 Demolition Demolition 5/12/2022 6/17/2022 5 27 <br />2 Grading Grading 6/18/2022 6/24/2022 5 5 <br />3 Building Construction Building Construction 6/25/2022 7/9/2023 5 270 <br />4 Paving Paving 7/10/2023 7/27/2023 5 14 <br />5 Architectural Coating Architectural Coating 7/28/2023 8/16/2023 5 14 <br />Residential Indoor: 148,838; Residential Outdoor: 49,613; Non-Residential Indoor: 0; Non-Residential Outdoor: 0; Striped Parking Area: 1,748 <br />(Architectural Coating – sqft) <br />Acres of Grading (Site Preparation Phase): 0 <br />Acres of Grading (Grading Phase): 5 <br />Acres of Paving: 0.67 <br />CalEEMod Version: CalEEMod.2020.4.0 Date: 11/10/2021 12:48 PMPage 8 of 35 <br />19386 Cabrillo at First Mixed-Use Residential - Orange County, Annual <br />EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied <br />Apx-194 <br />6/27/2022 <br />Planning Commission 2 –354