Laserfiche WebLink
Proposal for CEQA Analysis <br />Garry Avenue Business Park <br />July 26, 2021 <br />Page 11 <br />■ Costs have been allocated to tasks to determine the total budget. EPD may reallocate costs among <br />tasks, as needed, as long as the total budget Is not exceeded. <br />■ Additional review cycles oradditional versions of administrative drafts of any documents beyond <br />the assumptions contained within the scope of work will constitute additional work. <br />The budget is based on completion of work within a maximum 12-month schedule. If a delay of'90 days or <br />more occurs as a result of circumstances beyond control we reserve the right to adjust our budget to account <br />for increased labor rates and other costs. <br />