My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RESO 2020-40_4111 S MAIN
Clerk
>
Resolutions
>
PLANNING COMMISION
>
2020
>
RESO 2020-40_4111 S MAIN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2022 1:30:21 PM
Creation date
7/18/2022 1:30:18 PM
Metadata
Fields
Template:
PBA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Resolution No. 2020-40 <br />Page 5 of 6 <br />EXHIBIT A <br />Conditions of Approval for Variance No. 2020-04 <br />Variance Number 2020-04 is approved subject to compliance, to the reasonable <br />satisfaction of the Planning Manager, with all applicable sections of the Santa Ana <br />Municipal Code, the California Administrative Code, the California Building Standards <br />Code and all other applicable regulations. <br />The Applicant must comply in full with each and every condition listed below prior to <br />exercising the rights conferred by this conditional use permit. <br />The Applicant must remain in compliance with all conditions listed below throughout the <br />life of the conditional use permit. Failure to comply with each and every condition may <br />result in the revocation of the conditional use permit. <br />1.All proposed site improvements must conform to the Site Plan Review (DP No. <br />2018-43) and the staff report exhibits. <br />2.Variance No. 2020-04 shall not become effective unless Conditional Use Permit <br />No. 2020-19 is approved and in full effect. <br />3.Any amendment to this variance must be submitted to the Planning Division for <br />review. At that time, staff will determine if administrative relief is available or if the <br />variance must be amended. <br />4.Prior to the issuance of a building permit to construct the facility, a full landscape <br />and irrigation plan shall be submitted for review and app roval by the Planning <br />Division. Plans must include: <br />a.A six (6) foot tall solid block wall with vines to surround the facility and <br />its related equipment on all sides; <br />b.Installation of additional 36-inch box trees where missing from existing <br />planter areas along Main Street and the south property line to scre en <br />the proposed facility and its related equipment; and <br />c.A 36-inch box tree replacement at a 1:1 ratio for any removed trees. <br />5.The applicant shall be responsible for maintaining the subject site free from <br />debris, overgrown vegetation, and graffiti. Any gra ffiti must be removed within 24 <br />hours. <br />6.The Applicant shall provide a 24-hour phone number to which interference <br />problems may be reported. This condition will also apply to all existing facilities in <br />the City of Santa Ana.
The URL can be used to link to this page
Your browser does not support the video tag.