Laserfiche WebLink
EXHIBIT A <br />Conditions of Approval for Conditional Use Permit No. 2020-07 <br />Conditional Use Permit No. 2020-07 is approved subject to compliance, to the <br />reasonable satisfaction of the Planning Manager, with all applicable sections of the <br />Santa Ana Municipal Code, the California Administrative Code, the California Building <br />Standards Code and all other applicable regulations. <br />The Applicant must comply in full with each and every condition listed below prior to <br />exercising the rights conferred by this conditional use permit. <br />The Applicant must remain in compliance with all conditions listed below throughout the <br />life of the conditional use permit. Failure to comply with each and every condition may <br />result in the revocation of the conditional use permit. <br />1. All site improvements must conform to Development Project Review (DP Nos. <br />2019-17 and 1998-114) and the staff report exhibits. <br />2. All deteriorating and/or faded stealth fronds shall be replaced and all antennas <br />shall be painted a darker green to match the frond color of the surrounding palm <br />trees. <br />3. The pole of the cell tower shall be painted a darker brown to be consistent with <br />the surrounding trees. <br />4. The Applicant shall provide a 24-hour phone number to which interference <br />problems may be reported. <br />5. The Applicant will provide a "single point of contact" in its Engineering and <br />Maintenance Departments to insure continuity on all interference issues. The <br />name, telephone number, fax number and e-mail address of that person shall be <br />provided to the City's designated representative after approval of the new CUP. <br />6. The Applicant shall ensure that the lessee or other user(s) shall comply with the <br />terms and conditions of this permit, and shall be responsible for the failure of any <br />lessee or other users under the control of permit Applicant to comply. <br />7. The major wireless facility shall be subject to any applicable California Building <br />Code or federal requirements for seismic safety, retrofit, and/or upgrades as <br />deemed necessary by the Building Division. <br />8. Conditional Use Permit No. 2020-07 expires 1 0 years from the date of Planning <br />Commission approval. <br />#29530v3