My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
OC RECYCLING
Clerk
>
Contracts / Agreements
>
O
>
OC RECYCLING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2022 8:27:37 AM
Creation date
7/25/2022 8:23:43 AM
Metadata
Fields
Template:
Contracts
Company Name
OC RECYCLING
Contract #
N-2022-199
Agency
City Attorney's Office
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
e. Submit evidence that OC Recycling Parties e. Within fourteen (14) calendar <br />have ordered the approved proprietary days after Task No. 2.d. <br />biotreatment BMP system, piping, catch basin <br />inlet, and pump system, to the City. <br />a. Request a pre -construction meeting on the a. Within ten (10) business days <br />Property with City and construction contractor after receiving all materials ordered <br />performing work. in Task No. l.d. See paragraph <br />2.2.1 for delay provision. <br />b. Hold pre -construction meeting on the <br />Property with City and construction contractor <br />performing work. <br />b. At the time scheduled during <br />Task No. 3.a, which must be before <br />beginning any work to implement <br />the approved 2019 or Revised <br />WQMP. See paragraph 2.2.2 for <br />delay provision. <br />4. Submit a notice of commencement of work. Within ten (10) business days after <br />the pre -construction meeting in Task <br />No. 3.b and prior to beginning any <br />work to implement the approved <br />2019 or Revised WQMP. <br />5. Start construction (contractor mobilization and Within ten (10) business days after <br />demolition). submitting a notice of <br />6. Submit inspection request(s) to City prior to <br />backfilling the approved proprietary <br />biotreatment BMP system, pump system, and <br />storm drain infrastructure. These inspection <br />request(s) are in addition to any other required <br />inspections such as a City Public Works <br />Agency inspection of any encroachment into <br />the public right of way way or Planning and <br />Building Agency related to the Electrial <br />Permit. <br />commencement required by Task <br />No. 4. <br />Within forty (40) days after starting <br />construction under Task 4 and at <br />least ten (10) business days prior to <br />any required inspection(s). See <br />paragraph 2.2.2 for delay provision. <br />Complete repair/correction requests issued by Within thirty (30) days after the City <br />City and call for reinspection issues the repair/correction request. <br />See paragraph 2.2.2 for delay <br />provision. <br />8. Complete implementation of the Approved Within thirty (30) days after the <br />WQMP and obtain a passing final inspection completion of Task No. 6, or, if a <br />from City. repair/correction request is issued <br />
The URL can be used to link to this page
Your browser does not support the video tag.