My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ALL ENVIRONMENT, INC.
Clerk
>
Contracts / Agreements
>
A
>
ALL ENVIRONMENT, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 9:51:38 AM
Creation date
7/25/2022 3:01:06 PM
Metadata
Fields
Template:
Contracts
Company Name
ALL ENVIRONMENT, INC.
Contract #
A-2022-064
Agency
Public Works
Council Approval Date
5/3/2022
Expiration Date
5/1/2023
Insurance Exp Date
9/14/2023
Destruction Year
2028
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />EXHIBIT A <br />SCOPE OF SERVICES - RFP NO.: 21-014 <br />PROJECT MOBILIZATION: Upon award of the project, AEI will obtain the necessary documentation <br />available from the Client to include Building Plans/Blueprints, previously prepared Facility <br />Condition Assessments, maintenance inspection reports, as well as any other pertinent <br />documentation. At the mobilization stage of the project, AEI will also determine those team <br />members who are best qualified to work on the various portions of the project. <br />DocuMENTATION REVIEW: AEI will review all building plans/blueprints for each project. AEI will <br />also perform a thorough review of previous property condition inspection reports, capital <br />improvement plans, and building maintenance history reports to determine the effective ages of <br />the various equipment and major building systems. AEI will use this information in conjunction <br />with data collected from the field inspections. AEI will also review available Asbestos and LBP <br />surveys to determine if there are any environmental concerns associated with future building <br />renovations/capital improvements which may require abatement, and thus increase cost <br />estimates. <br />INTERVIEWS: After a thorough review of all available project documentation and plans, AEI will <br />interview individuals knowledgeable about the buildings' maintenance, capital improvements and <br />energy consumption history. Interviews with outside maintenance firms and service providers <br />(fire alarm, elevator, plumbing, mechanical, etc.) will also be conducted from the beginning of <br />the project through the data analysis and reporting stage. <br />FIELD INSPECTION (CONDITION ASSESSMENT): After a comprehensive review of plans, and prior <br />reports, AEI will conduct a field inspection of the buildings and grounds of each property. AEI <br />will also tailor the field inspection based upon the document reviews conducted prior to the site <br />visits. At a minimum, the following areas will be surveyed: <br />• All Buildings will be surveyed (roofs, mechanical areas, common areas, cellars, basements, <br />exteriors). <br />• All Site areas (100%) will be surveyed <br />• 100% of building exteriors will be surveyed <br />• 100% of building mechanical rooms will be surveyed. <br />• A representative sampling of building interior areas will be surveyed. <br />• All Assets will be inventoried and the condition of same will be assessed as part of the FCA. <br />An inventory of various building systems and equipment, it is effective age and condition will <br />be taken during the field inspections. <br />• Costs associated with fire & life safety issues, deferred maintenance and a long-term capital <br />reserve extending out to 10 years. <br />
The URL can be used to link to this page
Your browser does not support the video tag.