My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ALL ENVIRONMENT, INC.
Clerk
>
Contracts / Agreements
>
A
>
ALL ENVIRONMENT, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 9:51:38 AM
Creation date
7/25/2022 3:01:06 PM
Metadata
Fields
Template:
Contracts
Company Name
ALL ENVIRONMENT, INC.
Contract #
A-2022-064
Agency
Public Works
Council Approval Date
5/3/2022
Expiration Date
5/1/2023
Insurance Exp Date
9/14/2023
Destruction Year
2028
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E - RELEVANT PROJECT EXPERIENCE <br />Laguna Art Museum, Laguna Beach, CA <br />Client: <br />The Laguna Art Museum <br />Contact: <br />Joel Woodward — Director of Operations — 307 Cliff Drive, Laguna Beach, CA 92651 <br />•woodard la unaartmuseum.or 949 494-8971 x206 <br />Project <br />AEI prepared Facility Condition Assessment/Property Condition Survey on an 18,000 SF <br />Discussion: <br />art museum and community center that was originally constructed in 1929 and <br />expanded in 1986. The building was located on a zero -lot line basis and included 2 <br />floors above grade plus a walk -out basement/terrace level. The assessment was <br />completed in accordance with ASTM E2018-15. AEI's detailed investigation included the <br />use of specialty system consultants which provided detailed analysis of the following <br />building systems: 1) Building Envelope & Roof; 2) Mechanical, Electrical, Plumbing (MEP) <br />/ Fire & Life Safety & 3) Elevator Conveying Systems. AEI's detailed report included <br />short term cost estimates related to deferred maintenance and accessibility upgrades. A <br />long-term capital plan over a 15-year period for various system replacements and <br />retrofits. <br />Presentation: <br />Narrative report with photographs detailing various building systems. Cost estimate <br />tables were presented for immediate and life safety repairs, and a detailed capital <br />reserve plan over a 15-year period. A Review of ADA requirements compliance and <br />Seismic analysis was not included in the Scope of Work. <br />Date: <br />Project authorization was granted on 1/3/20 and was com leted on 2/3/20 <br />k <br />A ■' <br />PF <br />lr <br />T <br />"AEI Consultants <br />
The URL can be used to link to this page
Your browser does not support the video tag.