My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ALL ENVIRONMENT, INC.
Clerk
>
Contracts / Agreements
>
A
>
ALL ENVIRONMENT, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 9:51:38 AM
Creation date
7/25/2022 3:01:06 PM
Metadata
Fields
Template:
Contracts
Company Name
ALL ENVIRONMENT, INC.
Contract #
A-2022-064
Agency
Public Works
Council Approval Date
5/3/2022
Expiration Date
5/1/2023
Insurance Exp Date
9/14/2023
Destruction Year
2028
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E - RELEVANT PROJECT EXPERIENCE <br />County of Kauai — Waste Water (CMMS) <br />Client: <br />Coun of Kauai <br />Project <br />The Wastewater Treatment Facilities Program is responsible for the operation, <br />Discussion: <br />maintenance and repair of all County wastewater collection, treatment and disposal <br />facilities in order to provide a consistent and reliable level of performance necessary <br />to protect health and the environment. Activities include preventive maintenance <br />(PM), treatment process control, wastewater effluent reuse, solids management, <br />safety and training, laboratory monitoring for regulatory compliance. <br />Objectives for the Asset and Maintenance Management Control: <br />1. Identify and record all assets located at the four plants and associated pump <br />stations located throughout the island. <br />2. Track and record ALL maintenance activities, both preventive and corrective. <br />3. Define PM requirements and establish leveled schedules designed to properly <br />maintain assets and extend longevity. <br />4. Accurately monitor maintenance costs for all assets and support life cycle <br />determinations. <br />5. Ability to produce reliable reporting measures. <br />Current <br />1. Nearly 1,200 assets are being maintained by 25 maintenance staff distributed <br />Status: <br />among the four plants. <br />2. On -going interfacing to identify and document replacement and/or additional <br />assets. <br />3. On -going training and support to include development/refinement of PM Tasks as <br />well as Maintenance Routes designed to minimize work orders. <br />4. Database is providing feedback through on-line services and reports to assist <br />management in developing future goals, projects, and schedules. <br />5. Reliance on maintenance management system for asset management. <br />t <br />RM <br />AEI Consultants <br />
The URL can be used to link to this page
Your browser does not support the video tag.