My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ALL ENVIRONMENT, INC.
Clerk
>
Contracts / Agreements
>
A
>
ALL ENVIRONMENT, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 9:51:38 AM
Creation date
7/25/2022 3:01:06 PM
Metadata
Fields
Template:
Contracts
Company Name
ALL ENVIRONMENT, INC.
Contract #
A-2022-064
Agency
Public Works
Council Approval Date
5/3/2022
Expiration Date
5/1/2023
Insurance Exp Date
9/14/2023
Destruction Year
2028
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E — RELEVANT PROJECT EXPERIENCE <br />Green Airport (CMMS <br />Client: <br />Rhode Island Airport Corporation <br />Project <br />RIAC is the corporation overseeing the TF Green Airport, as well as 5 other smaller <br />Discussion: <br />airports, just south of Providence Rhode Island. M-PEf is currently be utilized at the <br />garage facility to track maintenance PM's, inventory costs, and job history and <br />costs. They have typical passenger traffic in the area of 4 million passengers per <br />year. <br />Objectives for the Asset and Maintenance Management Control: <br />1. Convert all active items from old Access CMMS to M-PET <br />2. Track ALL maintenance activities, both preventive and corrective, for assets <br />associated with the equipment. <br />3. Assist with Preventive Maintenance (PM) requirements and establish leveled <br />schedules designed to properly maintain assets and extend longevity. <br />4. Accurately monitor maintenance costs for all assets and support life cycle <br />determinations. <br />Current <br />1. Around 250 assets are being maintained by 4 Maintenance staff. <br />Status: <br />2. On -going interfacing to identify and document additional assets. <br />3. On -going development/refinement of PM Tasks <br />4. Future integration with fuel pump program to monitor vehicle mileage and <br />performance <br />ITAF <br />AEI Consultants <br />
The URL can be used to link to this page
Your browser does not support the video tag.