My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ALL ENVIRONMENT, INC.
Clerk
>
Contracts / Agreements
>
A
>
ALL ENVIRONMENT, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 9:51:38 AM
Creation date
7/25/2022 3:01:06 PM
Metadata
Fields
Template:
Contracts
Company Name
ALL ENVIRONMENT, INC.
Contract #
A-2022-064
Agency
Public Works
Council Approval Date
5/3/2022
Expiration Date
5/1/2023
Insurance Exp Date
9/14/2023
Destruction Year
2028
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Steven Peck — Project Manager <br />B.S. Mechanical Engineering; University of California, Irvine <br />Mr. Peck provides project management to ensure ASTM compliance and satisfaction of <br />client requirements for Facility Condition Assessments, Property Conditions Assessments, <br />as well as Property Status Reports. Property Condition Assessments include identifying the <br />structural framing, foundations, HVAC systems, MEP systems, roof systems and exterior <br />finishes of a property. As part of the Project Status Reports, Mr. Peck observes overall <br />progress of construction sites and interior renovation projects as well as the different <br />building systems over the duration of construction. <br />RELEVANT PROJECT EXPERIENCE <br />• Faith -based — Field assessment and Facility Condition Assessment Report <br />preparation of project buildings for the purposes of providing prioritization and <br />budgeting of observed deferred maintenance, and anticipated capital expenditures <br />related to building system and component upkeep. Prioritization included health and <br />safety assessment related to site access and system usage. <br />• Industrial/Manufacturing Portfolio - Field assessment and Property Condition <br />Assessment Report preparation of 1.3 MM SF building for the purposes of providing <br />flood damage assessment. Building systems were mapped against flood plain <br />elevations and costs of maximum loss were estimated. <br />• Commercial Office - Field assessment and Property Condition Assessment Report <br />preparation of 350,000 SF building for the purposes of providing pre -acquisition <br />budgeting of observed deferred maintenance. . <br />• Hospitality - Field assessment and Property Condition Assessment Report <br />preparation of 67-story high-rise building for the purposes of providing pre -acquisition <br />budgeting of observed deferred maintenance. <br />• Educational - Field assessment and Facility Condition Assessment Report preparation <br />of k-5 school for the purposes of providing budgeting and cost estimated to mitigate <br />deferred maintenance. <br />Prior to joining AEI Consultants, Mr. Peck performed independent property and casualty <br />insurance audits, property risk assessments, building fire rating surveys and fire protection <br />gradings. In addition, these assessments included assessing property and liability risks <br />and providing recommendations. <br />r AEI Consultants <br />
The URL can be used to link to this page
Your browser does not support the video tag.