My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Packet
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2022
>
7-25-22
>
Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/2/2022 4:38:22 PM
Creation date
8/2/2022 4:37:51 PM
Metadata
Fields
Template:
PBA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> Resolution No. 2022-XXX <br />Page 8 of 9 <br />7. At least one on-duty manager with authority over the activities within the facility <br />shall be on the premises during business hours. The on-duty manager’s <br />responsibilities shall include the monitoring of the premises to ensure compliance <br />with all applicable State laws, Municipal Code requirements and the conditions <br />imposed by the Department of Alcoholic Beverage Control (ABC) and the <br />conditional use herein. Every effort shall be undertaken in managing the subject <br />premises and the facility to discourage illegal and criminal activities and any <br />exterior area over which the building owner exercises control. <br /> <br />8. Kitchen food service shall be provided during all business-operating hours. <br /> <br />9. Violations of the Conditional Use Permit as contained in Section 41-647.5 of the <br />Santa Ana Municipal Code will be grounds for permit suspension and/or revocation <br />as described in Section 41-651 of the Santa Ana Municipal Code. <br /> <br />10. Within 90 days of adoption of this resolution, a Property Maintenance Agreement <br />shall be recorded against the property. The agreement will be subject to review <br />and applicability by the Planning and Building Agency, the Community <br />Development Agency, the Public Works Agency, and the City Attorney to ensure <br />that the property and all improvements located thereupon are properly maintained. <br />Applicant (and the owner of the property upon which the authorized use and/or <br />authorized improvements are located if different from the Applicant) shall execute <br />a maintenance agreement with the City of Santa Ana, which shall be recorded <br />against the property and which shall be in a form reasonably satisfactory to the <br />City Attorney. The maintenance agreement shall contain covenants, conditions <br />and restrictions relating to the following: <br /> <br />a) Compliance with operational conditions applicable during any period(s) of <br />construction or major repair (e.g., proper screening and securing of the <br />construction site; implementation of proper erosion control, dust control and <br />noise mitigation measure; adherence to approved project phasing etc.); <br /> <br />b) Compliance with ongoing operational conditions, requirements and <br />restrictions, as applicable (including but not limited to hours of operation, <br />security requirements, the proper storage and disposal of trash and debris, <br />enforcement of the parking management plan, and/or restrictions on certain <br />uses); <br /> <br />c) Ongoing compliance with approved design and construction parameters, <br />signage parameters and restrictions as well as landscape designs, as <br />applicable; <br /> <br />d) Ongoing maintenance, repair and upkeep of the property and all <br />improvements located thereupon (including but not limited to controls on the <br />proliferation of trash and debris on or about the property; the proper and <br />timely removal of graffiti; the timely maintenance, repair and upkeep of <br />damaged, vandalized and/or weathered buildings, structures and/or <br />improvements; the timely maintenance, repair and upkeep of exterior paint, <br />7/25/2022 <br />Planning Commission 3 –13
The URL can be used to link to this page
Your browser does not support the video tag.