Laserfiche WebLink
-13- <br />1. Timellne <br />A. CMAmusementswill work withcityofSantaAna(CITY)todevelop time -line to include <br />sufficient time, safetymeasures insetting up, operating and tearing down rides and games for <br />events <br />B. Time -line willinclude appropriate scheduling ofsecuringallpermitsandlicensesprior to <br />commencement of event <br />IL Equipment <br />A. Ferris wheel, as required by city, along with mixture of major and kiddlerides, <br />1. Merry Go Round <br />2. Paratrooper <br />3. Fanhouse <br />4. Tornado <br />5. Sizzler <br />6. Zipper <br />7, Swings <br />8. Go Gator <br />9. Speedway <br />10.Loop 0 Plane <br />I L .Roadster <br />12. Fun Slide <br />13. Train <br />14. Gravitron <br />15. Ferris Wheel <br />13. Support Equipment <br />1. Office trailer for management, accounting, and meetings <br />2. Two ticket booths, per CITY requirement <br />C. Four Game booths, per CITY requirement <br />III. Security <br />A. Licensed Security Company for overnight protection of equipment <br />B. Will work with CITY to develop security plan specific to city <br />C. Complete background checks on all employees <br />IV. Safety <br />A. Rides inspected and ticketed by OSHA <br />B. California Fite Code adhered too <br />C. Inspections byalllocal,statejurisdictionstoinclude fire department,buildingdepartmentandany <br />and all other bodies of government, prior to opening. <br />