My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KTUA
Clerk
>
Contracts / Agreements
>
K
>
KTUA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2022 1:31:02 PM
Creation date
8/16/2022 8:33:39 AM
Metadata
Fields
Template:
Contracts
Company Name
KTUA
Contract #
A-2022-151
Agency
Public Works
Council Approval Date
8/2/2022
Expiration Date
8/1/2025
Insurance Exp Date
9/1/2022
Destruction Year
2030
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT 1 <br />final deliverable, the following activities should be anticipated once the Notice to Proceed (NTP) is <br />authorized and as the Project progresses: <br />• Project Kick-off Meeting <br />• Weekly PDT Meetings <br />• Up to Five Community/Stakeholder Meetings <br />• Two City Council Meetings/Presentations <br />• Project Schedule Management <br />• Monthly Progress Reports <br />• Monthly Cost Accounting <br />• Quality Assurance / Quality Control <br />Of particular importance is the monthly PDT Meetings. The consultant shall prepare, update, and <br />provide staff with a punch list prior to the meeting. City staff will be participating and guiding the <br />development of the SMSA Update throughout the process. <br />Task 2: Data collection: Data collection will include, but not be limited to; traffic counts, collision data for the <br />past five years, posted speed limit, 85% the speed limit, lane configurations, street classification, lane <br />widths, traffic citations, street lighting, trees, transit stops, transit boarding/alighting, street crossings, <br />and adjacent land uses. <br />Task 3: Community Survey: A community survey to assess safety concerns shall be conducted to assist in <br />determining the prioritization criteria in later tasks. <br />Task 4: Analysis: The analysis will consist of a thorough review and study of the data collected particularly the <br />citywide collisions within the past five -years (20,000+). Special focus will be placed on all pedestrian <br />and bicycle involved collisions. The analysis will review collisions to identify correctable collision <br />patterns. The review will include, but not be limited to; time of day, day of the week, night time, age of <br />parties, year by year trends, primary collision factors, type of collisions, severity of injury, and <br />fatalities. Review of actual collision reports for the past five -years will be required. <br />Task 5: Location Prioritization and Field Review: Conduct a safety evaluation and field reviews for street <br />segments and intersections that present the highest risk to vulnerable roadways users (bicyclists and <br />pedestrians). A prioritization of risk factors shall be established as part of this Task and may include <br />collision patterns, severity of injuries, and proximity to school, parks, or other pedestrian/bicycle <br />generating uses. The field reviews shall be conducted while school is in session. <br />Task 6: Recommended Countermeasures: Based on the data collection, field review and collision analysis; <br />street improvements/counter-measures shall be proposed to mitigate potential future collisions, <br />including multiple alternatives where appropriate. The alternative street improvement options may <br />vary in cost or ease of implementation. Countermeasures shall include engineering, enforcement, and <br />education activities. All options will be considered. This project will encourage use of innovative and <br />creative street improvement options. <br />Task 7: Consistency Review: All proposed countermeasures shall be reviewed for consistency with local, <br />regional, and state policies, regulations, and guidelines. Potential countermeasures shall not be ruled <br />out due to inconsistency, however inconsistencies shall be identified and recommendations to allow <br />implementation offered. These recommendations may include, but not be limited to; engineering <br />
The URL can be used to link to this page
Your browser does not support the video tag.