My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Packet_8-22-22
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2022
>
8-22-22
>
Packet_8-22-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2022 2:43:39 PM
Creation date
8/23/2022 2:40:36 PM
Metadata
Fields
Template:
PBA
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
352
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Resolution No. 2022-XXX <br />Page 7 of 8 <br /> <br />9. If the HVAC system is upgraded, the system shall support a Minimum Efficiency <br />Reporting Value (MERV) 13. <br /> <br />10. Prior to issuance of a building permit, a Property Maintenance Agreement shall be <br />recorded against the property. The agreement will be subject to review and <br />applicability by the Planning and Building Agency, the Community Development <br />Agency, the Public Works Agency, and the City Attorney to ensure that the <br />property and all improvements located thereupon are properly maintained, <br />Applicant (and the owner of the property upon which the authorized use and/or <br />authorized improvements are located if different from the Applicant) shall execute <br />a maintenance agreement with the City of Santa Ana which shall be recorded <br />against the property and which shall be in a form reasonably satisfactory to the <br />City Attorney. The maintenance agreement shall contain covenants, conditions <br />and restrictions relating to the following: <br /> <br />a) Compliance with operational conditions applicable during any period(s) of <br />construction or major repair (e.g., proper screening and securing of the <br />construction site; implementation of proper erosion control, dust control and <br />noise mitigation measure; adherence to approved project phasing etc.); <br /> <br />b) Compliance with ongoing operational conditions, requirements and <br />restrictions, as applicable (including but not limited to hours of operation, <br />security requirements, the proper storage and disposal of trash and debris, <br />enforcement of the parking management plan, and/or restrictions on certain <br />uses); <br /> <br />c) Ongoing compliance with approved design and construction parameters, <br />signage parameters and restrictions as well as landscape designs, as <br />applicable; <br /> <br />d) Ongoing maintenance, repair and upkeep of the property and all <br />improvements located thereupon (including but not limited to controls on the <br />proliferation of trash and debris about the property; the proper and timely <br />removal of graffiti; the timely maintenance, repair and upkeep of damaged, <br />vandalized and/or weathered buildings, structures and/or improvements; <br />the timely maintenance, repair and upkeep of exterior paint, parking striping, <br />lighting and irrigation fixtures, walls and fencing, publicly accessible <br />bathrooms and bathroom fixtures, landscaping and related landscape <br />improvements and the like, as applicable); <br /> <br />e) If Applicant and the owner of the property are different (e.g., if the Applicant <br />is a tenant or licensee of the property or any portion thereof), both the <br />Applicant and the owner of the property shall be signatories to the <br />maintenance agreement and both shall be jointly and severally liable for <br />compliance with its terms; <br />8/22/2022 <br />Planning Commission 1 – 13
The URL can be used to link to this page
Your browser does not support the video tag.