Laserfiche WebLink
Garry Avenue Business Park at 1700, 1720, and 1740 E. Garry Avenue <br />August 22, 2022 <br />Page 2 <br />2 <br />8 <br />7 <br />1 <br />Item Information <br />North Professional Offices <br />East Professional Offices <br />South Vacant (Alton Avenue right-of-way) and <br />Industrial <br />Surrounding Land Uses <br />West Costa Mesa (SR-55) Freeway <br />Site Size 5.13 acres <br />Existing Site Development Developed with three professional office buildings containing a <br />total of 105,558 square feet, constructed between 1972 and <br />1974 <br />Use Permissions Allowed with approval of a zone change and CUP <br />Development Standards Section 41-471 et seq.Zoning Code Sections <br />Affected Uses Section 41-472.5 (i) <br />Project Description <br />The applicant is requesting to demolish three office buildings with a total of 105,558 <br />square feet to construct a 91,500-square foot, 43.5-tall industrial building for warehousing <br />and distribution purposes. Of the total square footage, 81,500 square feet will be used for <br />warehousing and distribution activities, and 10,000 square feet will be used for <br />supportive/ancillary office areas. A total of 10 loading docks will be provided at the rear <br />(south) portion of the building. The building has been designed to allow the construction <br />of future demising wall to create two tenant spaces. <br />In addition to the new structure, the site will be improved with new landscaping, paving, <br />onsite parking, and improvements to the public right-of-way. The improvements include <br />onsite landscaping and a landscape edge along the SR-55 Freeway that takes into <br />account the freeway’s future widening, scheduled to begin in 2022. In addition, the project <br />site will provide 145 onsite parking spaces, an onsite employee amenity area, enhanced <br />paving at driveway entrances, new curb and gutter, street lights, and paving along the <br />project frontage on Garry Avenue. Although not required, the project will provide an onsite <br />walkway for pedestrians along the project frontage. <br />The design of the structure is contemporary, with exterior finishes that would enhance the <br />building’s presence along the SR-55 Freeway. The building will contain a mixture of <br />materials, including performance vision glass, metal awnings, and concrete panels <br />painted in white, various shades of tan and brown, and soft green hues. The building’s <br />elevations have been designed to allow for placement of future wall signage to ensure <br />compliance with applicable Santa Ana Municipal Code (SAMC) requirements. The project <br />is intended to be constructed in a single phase. <br />8/22/2022 <br />Planning Commission 2 – 2