My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Packet_8-22-22
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2022
>
8-22-22
>
Packet_8-22-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2022 2:43:39 PM
Creation date
8/23/2022 2:40:36 PM
Metadata
Fields
Template:
PBA
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
352
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Garry Avenue Business Park at 1700, 1720, and 1740 E. Garry Avenue <br />August 22, 2022 <br />Page 5 <br />2 <br />8 <br />7 <br />1 <br />To operate a warehouse and distribution facility, the project requires approval of a CUP <br />pursuant to Section 41-472 (i) of the SAMC. Approval of the CUP would be consistent <br />with the General Plan and would not be injurious or detrimental to surrounding properties. <br />As analyzed in previous sections of this report, the development has been designed to <br />minimize impacts onto surrounding properties and comply with all applicable development <br />standards for the M1 zoning district. In addition, the project site is located within an area <br />that is not near sensitive land uses such as residential neighborhoods, schools, or parks. <br />Moreover, access to the SR-55 Freeway is provided at the Dyer Road interchange, by <br />way of Garry Avenue and Pullman Street, a distance of less than 0.50 driving miles. <br />Lastly, the loading docks have been positioned at the south of the building in order to <br />minimize noise and aesthetic impacts onto surrounding properties. <br />Approval of the CUP and amendment application would also be consistent with various <br />goals and policies of the General Plan as follow: <br />•Goal LU-2: Land Use Needs – Provide a balance of land uses that meet Santa <br />Ana’s diverse needs. <br />o Policy LU- 2.1 Employment Opportunities – Provide a broad spectrum of <br />land uses and development that offer employment opportunities for current <br />and future Santa Ana residents. <br />o Policy LU-2.6 Encourage Investment – Promote rehabilitation of properties <br />and encourage increased levels of capital investment to create a safe and <br />attractive environment. <br />o Policy LU-2.7 Business Incubator. Support land use decisions that <br />encourage the creation, development, and retention of businesses in Santa <br />Ana. <br />•Goal LU-3: Compatibility of Uses – Preserve and improve the character and <br />integrity of existing neighborhoods and districts. <br />o Policy LU-3.4 Compatible Development – Ensure that the scale and <br />massing of new development is compatible and harmonious with the <br />surrounding built environment. <br />o Policy LU-3.7 Attractive Environment – Promote a clean, safe, and creative <br />environment for Santa Ana’s residents, workers, and visitors. <br />o Policy LU-3.8 Sensitive Receptors – Avoid the development of industry and <br />sensitive receptors in close proximity to each other that could pose a <br />hazard to human health and safety due to the quantity, concentration, or <br />physical or chemical characteristics of the hazardous materials utilized, or <br />the hazardous waste an operation may generate or emit. <br />•Lastly, the amendment application is consistent with the General Plan Appendix <br />A, Table LU-A-2. Interim Industrial Flex Uses for the M-1 that allows warehousing. <br />Conditions of approval addresses construction-related and ongoing operational impacts <br />that could result from the project. Those conditions are attached as Exhibit A to the CUP <br />resolution. <br />8/22/2022 <br />Planning Commission 2 – 5
The URL can be used to link to this page
Your browser does not support the video tag.