My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Packet_8-22-22
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2022
>
8-22-22
>
Packet_8-22-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2022 2:43:39 PM
Creation date
8/23/2022 2:40:36 PM
Metadata
Fields
Template:
PBA
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
352
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Garry Avenue Business Park at 1700, 1720, and 1740 E. Garry Avenue <br />August 22, 2022 <br />Page 7 <br />2 <br />8 <br />7 <br />1 <br />peculiar to the parcel or to the project, has been addressed as a significant effect in the <br />prior EIR, or can be substantially mitigated by the imposition of uniformly applied <br />development policies or standards […] then an additional EIR need not be prepared for <br />the project solely on the basis of that impact” (State CEQA Guidelines Section 15183(c)).” <br />The GPU was adopted, and the GPU EIR certified, in April 2022 (State Clearinghouse <br />Number 2020029087); the GPU went into effect on May 26, 2022. Any decision by the <br />City affecting land use and development must be consistent with the GPU. The GPU EIR <br />evaluates the potential environmental effects associated with implementation of the GPU <br />and addresses appropriate and feasible mitigation measures that would minimize or <br />eliminate these impacts. A project is consistent with the GPU if the development density <br />does not exceed what was contemplated and analyzed for the parcel(s) in the certified <br />GPU EIR and complies with the associated standards applicable to that development <br />density (State CEQA Guidelines Section 15183(i)(2)). Development density standards <br />can include the number of dwelling units per acre, the number of people in a given area, <br />floor area ratio (FAR), and other measures of building intensity, building height, size <br />limitations, and use restrictions. <br />The GPU identifies that the Interim Development Standard for the FLEX-3 area is M1. <br />The M1 zone provides for a variety of light industrial uses, including warehousing, <br />manufacture, assembly, machine shops, wholesale businesses. The Project would result <br />in a FAR of 0.42, which is within the projections of the GPU EIR, which evaluated a density <br />of 3.0 FAR on the site. The GPU EIR adequately anticipated and analyzed the impacts of <br />this Project, identified applicable mitigation measures necessary to reduce impacts of the <br />Project, and the Project implements the applicable mitigation measures. The Project, <br />therefore, qualifies for an exemption from additional environmental review as set forth in <br />State CEQA Guidelines Section 15183. The full exemption analysis is provided as Exhibit <br />10 of this report. Based on this analysis, a Notice of Exemption, Environmental Review <br />No. 2021-54 will be filed for this project. <br />FISCAL IMPACT <br />There is no fiscal impact associated with this action. <br />EXHIBIT(S) <br />1. Amendment Application Ordinance <br />2. Conditional Use Permit Resolution <br />3. Vicinity Zoning and Aerial View <br />4. Site Photo <br />5. Site Plan <br />6. Floor Plan <br />7. Landscape Plans <br />8. Building Elevations <br />8/22/2022 <br />Planning Commission 2 – 7
The URL can be used to link to this page
Your browser does not support the video tag.