Laserfiche WebLink
DocuSign Envelope ID: 4AFBE705-B08A-4D8C-A99C-A43E4A48083F <br />APPENDIX A <br />CITY OF SANTA ANA <br />REQUEST FOR PROPOSALS 22-032 FOR <br />ON -CALL NETWORK CABLING SERVICES <br />SCOPE OF WORK <br />The City of Santa Ana is (CITY) is seeking proposals from qualified companies to provide <br />all labor and material for the installation of network cabling at various locations in Santa <br />Ana on an on -call basis. <br />Minimum Requirements/Qualifications: Proposers who do not meet the City's <br />minimum qualifications or fail to provide proof of the qualifications below will be <br />disqualified from the RFP process and will not be considered in the RFP process. <br />• Proposer or principal operators of the proposed company must be in business for a <br />minimum of 5 years, operating as a C-7 contractor with one or more RCDDemployed <br />for the last 5 years. <br />• Proposer must provide copies of current certificate(s) and BICSI registration <br />number verifying that one or more RCDD are currently employed by proposer and <br />will be assigned to the City. <br />• Proposer must include copies of all product or industry certifications, including <br />manufacture certification for installation of proposed materials and systems. <br />• Proposer must include abbreviated resumes of individuals that will have a direct role <br />in the delivery and supervision of these services demonstrating their experience and <br />technical capabilities. <br />I. Pr000ser's Responsibilities <br />A. The Proposer will be responsible for determining cabling distances either by <br />onsite visit or site plan review. <br />B. The Proposer is responsible for obtaining any permits in order to fulfill the <br />required terms of this contract, including each job performed hereunder. <br />(Note: The City does not typically require permits for low voltage work for <br />City projects. However, should the scope of work include conduit installation <br />and/or other tasks, permits would be required.) <br />C. The Proposer will supply all test equipment and resources required in order <br />to provide the City with all requisite acceptance testing. <br />On -Call Network Cabling Services 22-032 <br />10 <br />