Laserfiche WebLink
TOWNSITE SOLAR PROJECT ( BOULDER CITY, NV <br />The 50OK-MW solar energy storage facility located 20 minutes <br />outside of Las Vegas in Boulder City, NV is secured and monitored <br />24/7 byAISG's Central Monitoring Station. The system includes a one <br />gate intercom system,12 infra -red cameras and sensorequipment, <br />all working hand in hand with a 6-door access control system to <br />detectand keep record ofanyattempted accesstothefacility. AISG <br />designed an Aviglion and Honeywell system. <br />LOS ANGELES COUNTYOFFICE OF EDUCATION (LACOE) <br />LOS ANGELES, CA <br />AISG is providing systems design and consulting services to <br />LACOE— Phase 2 Upgrade. AISG performed a site assessment and <br />a network performance test, to test existing efficiency and <br />identify gaps. The findings and recommendations helped to <br />facilitate and shape a design in support of electronic security <br />systems enhancement and upgrade. The work included network <br />and telecom infrastructure design and consulting. AISG will <br />oversee the contractor's progress, invoices, and report of issues <br />during construction. <br />SANTA CLARITA SHERIFF'S SUBSTATION I SANTA CLARITA, <br />CA <br />AISG provided low voltage systems design services for the <br />construction of the Santa Clarita Sheriff's Station, located in Santa <br />Clarita, CA. The project involved the construction of approximately <br />50,000sq.ft. of spacetohousethe Los AngelesCounty Sheriffs <br />staff. AISG provided electronic security systems including <br />access control, alarm monitoring, and detention door monitoring <br />systems, telecommunications infrastructure, distributed antenna <br />system (DAS), and audiovisual systemsand infrastructuredesign. <br />L <br />'AISG <br />ros Angeles county Office of Education <br />6 <br />