Laserfiche WebLink
AIsG <br />Sample Job #2: <br />Scope of Work: Contractor shall provide and install one 12-strand single -mode fiber optic cable <br />running from the basement MDF to the 8th floor IDF. <br />• Fiber optic cable will terminate in the basement MDF onto a contractor -provided fiber patch <br />panel with ST-type connectors. <br />• In the 8th floor IDF, fiber optic cable should terminate onto a contractor -provided fiber patch <br />panel with ST-type connectors. <br />• Rack space required exists at both termination points. <br />• Fiber optic cable should be rated for 10 Gig over the entire installation length and meet all <br />fire standards for this type of installation. <br />• One, empty 4-inch conduit exists between the MDF in the basement and the basement IN <br />(the basement IN is vertically stacked with the IDF's on the floors above, including the <br />destination 8th floor IDF). <br />• Contractor shall provide and install four (4) one -inch, non -plenum, corrugated innerduct <br />from the basement MDF to the basement IN via existing 4-inch conduit noted above which <br />is 150 ft in length. <br />• At the exit point of the conduit in the basement IDF, transition one (1) of four (4) installed <br />innerduct to one (1) one -inch, riser -rated, corrugated innerduct, which will traverse from the <br />basement IN through the IN on each floor above, up to the 8th floor. <br />• Contractor shall provide (1) 4-inch core hole between the basement IN and the 1st floor IDF. <br />• Building Facilities Management has determined that floor is clear of obstruction for a 4-inch <br />core. <br />• Core hole shall be sleeved, and fire stopped per local, state, and industry standard codes. <br />• Remaining floors have an existing conduit for the riser -rated, corrugated innerduct to pass <br />through. <br />1) Provide a breakdown of hours to be billed. <br />2) Provide a breakdown of cost of materials. <br />3) Provide details and amounts of any and all other charges that would be billed to the City. <br />4) Provide approximation of elapsed time to complete work, beginning from authorization to <br />final acceptance. <br />SEE BELOW... <br />22 <br />