Laserfiche WebLink
AI9L%0+ <br />Labor Hours Worksheet <br />Total <br />Units <br />Labor <br />Hours <br />AISG <br />AISG <br />Per <br />Task <br />Description of Labor Task <br />Extended <br />Labor <br />Rate <br />Labor Sell <br />1 <br />Physical Site Survey / Project <br />Research / Recommendations <br />4.00 <br />$75.00 <br />300.00 <br />8 <br />Assemble/Install 20-foot section <br />of 2" FIBER Pathway/Cable <br />Consealment at IDF/MDF <br />12.00 <br />$75.00 <br />900.00 <br />500 <br />Cable/Install 12-Strand (OM3) <br />Fiber Backbone from MDF to IDF-1 <br />500-ft <br />15.00 <br />$75.00 <br />1,1 55.00 <br />24 <br />Terminate/ Label/Test(OM3) <br />Fiber connectors per strand <br />12.00 <br />$75.00 <br />900.00 <br />2 <br />Assemble/Install (11J) Rack Mount <br />Fiber Housing at IDF/MDF for <br />Fiber Connector Panels <br />2.00 <br />$75.00 <br />150.00 <br />2 <br />2 <br />1 <br />Core Drill <br />Travel Charge <br />Small Project Final Deliverables <br />(Floor Plans, Cat6 Test Results, <br />Digital Photos <br />6.00 <br />2.00 <br />2.00 <br />$75.00 <br />$75.00 <br />$75.00 <br />450.00 <br />150.00 <br />150.00 <br />Total Labor <br />Hours <br />51.00 <br />AISG Labor <br />Sell <br />$3,825.00 <br />Labor Sales Tax <br />10% <br />$382.50 <br />PROJECT TOTAL LABOR Et MATERIAL: $7,334.94 + TAX IF APPLICABLE. <br />WORK TO BE COMPLETED IN 1-3 DAYS. <br />