Laserfiche WebLink
RE -ADVERTISEMENT <br />Bid Item No. 4 — Furnish and Install Ameron Street Light Pole per C.O.S.A. Std. 1126H on New <br />Foundation: <br />This work consists of famishing and installing Ameron Street Light Pole including excavation, concrete <br />foundation, conduit, concrete restoration, installing and re -connecting all field wiring, traffic control and <br />traffic signal turn -on support per latest Caltrans Standards, City of Santa Ana Standard 1126H, Specifications <br />and as indicated on plans. <br />The unit price bid per each Ameron Street Light Pole shall include full compensation for furnishing all <br />labor, materials, tools, equipment, paving and appurtenances for all related items of work necessary for <br />the installation. No additional compensation will be allowed. <br />Bid Item No. 5 to 8 — Furnish and Install #8, #10 and #12 AWG Wire (Copper) and #6 AWG <br />Overhead Wire (Aluminum) <br />This work consists of furnishing and installing AWG Wire Copper or Aluminum, including splice <br />connections, curb termination conduit, fittings and sealant per latest Caltrans Standards, City of Santa Ana <br />Standards, Specifications and of type indicated on the plans. <br />The unit price bid per linear foot shall be considered full compensation for furnishing all labor, materials, <br />tools, equipment, paving and appurtenances for all related items of work necessary for the installation. No <br />additional compensation will be allowed. <br />Bid Item No. 9 to 10 — Furnish and Install PVC Schedule 40 Conduit: <br />This work consists of furnishing and installing Polyvinylchloride (PVC) street lighting electrical conduit <br />including pull tape, ground wire, fittings, duct seal and appurtenances complete and in place, per latest <br />Caltrans Standards, City of Santa Ana Standards, Specifications and of the size indicated on the plans. <br />The unit price bid per linear foot of PVC Schedule 40 Conduit shall include full compensation for <br />furnishing all labor, materials, tools, equipment, paving and appurtenances for all related items of work <br />necessary for the installation. No additional compensation will be allowed. <br />Bid Item No. 11 to 12 — Furnish and Install Pull Box: <br />This work consists of furnishing and installing and/or replacing pull box including the removal and/or <br />modification of any interfering portions of existing pullbox, conduit, PCC, etc, per latest Caltrans <br />Standards, City of Santa Ana Standards, Specifications and of the size indicated on the plans. <br />The unit price for each Pull Box shall be considered full compensation for furnishing all labor, materials, <br />tools, equipment, paving and appurtenances for all related items of work necessary for the installation. No <br />additional compensation will be allowed. <br />City of Santa Ana RFP 21-095 <br />Exhibit Page Al-12 <br />