Laserfiche WebLink
RE -ADVERTISEMENT <br />Item No. 5 - PCC Curb (B-1) <br />The work under this item consists of grading, compacting subgrade, and constructing PCC Curb in <br />accordance with the provisions of Section 301-1, "Subgrade Preparation," and Section 303-5, "Concrete <br />Curbs, Walks, Gutters, Cross Gutters, Alley Intersections, Access Ramps, and Driveways," of the Standard <br />Specifications, plans, and contract document specifications. <br />Payment for this item shall be at the contract unit price bid per Linear Foot as listed in the Bid Proposal, and <br />shall include full compensation for doing all work, including furnishing all materials, labor, equipment, tools, <br />and incidentals as required and no additional compensation will be allowed therefore. <br />Item No. 6 - PCC Spandrel <br />The work under this item consists of grading, compacting subgrade, and constructing 9-inch thick PCC <br />Spandrel in accordance with the provisions of Section 301-1, "Subgrade Preparation," and Section 303-5, <br />"Concrete Curbs, Walks, Gutters, Cross Gutters, Alley Intersections, Access Ramps, and Driveways," of the <br />Standard Specifications, plans, and contract document specifications. <br />Payment for this item shall be at the contact unit price bid per Square Foot as listed in the Bid Proposal, and <br />shall include full compensation for doing all work, including furnishing all materials, labor, equipment, tools, <br />and incidentals as required and no additional compensation will be allowed therefore. <br />Item No. 7 - PCC Cross Gutter <br />The work under this item consists of grading, compacting subgrade, and constructing 9-inch thick PCC cross <br />gutter in accordance with the provisions of Section 301-1, "Subgrade Preparation," and Section 303-5, <br />"Concrete Curbs, Walks, Gutters, Cross Gutters, Alley Intersections, Access Ramps, and Driveways," of the <br />Standard Specifications, plans, and contract document specifications. <br />Payment for this item shall be at the contract unit price bid per Square Foot as listed in the Bid Proposal, and <br />shall include full compensation for doing all work, including furnishing all materials, labor, equipment, tools, <br />and incidentals as required and no additional compensation will be allowed therefore. <br />Item No. 8 - Furnish and Install 18" Deep Polyethylene Root Barrier <br />Payment for this item shall be at the contract unit price bid per linear foot as listed in the Bid Proposal, and <br />shall include full compensation for doing all work, including furnishing all materials, labor, equipment, tools, <br />and incidentals as required and no additional compensation will be allowed therefore. <br />Item No. 9 - Root Shaving <br />Payment for this item shall be at the contract unit price bid per Each as listed in the Bid Proposal, and <br />shall include full compensation for doing all work, including furnishing all materials, labor, equipment, <br />tools, and incidentals as required and no additional compensation will be allowed therefore. <br />City of Santa Ana RFP 21-095 <br />Exhibit Page Al-14 <br />