Laserfiche WebLink
RE -ADVERTISEMENT <br />QUANTITIES FOR FEE SCHEDULE (UNDER SEPARATE COVER) <br />For the purposes of providing a Fee Schedule based on the below Sample Task Orders, the following work <br />items and quantities are provided. The Fee Schedule in Attachment 5: <br />Each Fee Schedule shall include a schedule of the hourly billing rates for ALL contractor and subcontractor <br />staff and labor personnel. Additionally, for each discipline that a company seeks to be considered, the below <br />table(s) would be completed for the purpose of review of the proposals. For example, if a Contractor is <br />submitting for Traffic Signal and Concrete Paving— Wheel Chair Ramp, Sample Task Orders A and C would <br />be completed as part of the Fee Schedule by filling in of the last two columns for the relevant sample task <br />orders by category. However, actual work will be paid for as described in Section I.A. "Nature of Work," <br />and according to the schedule of hourly billing rates. Sample Task Orders for Traffic Signal, Street Light and <br />Concrete Paving - Wheel Chair Ramp in public right-of-way related work are, respectively: <br />Sample Task Order A — Traffic Signal <br />(Assume all work within Paved areas) <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Total <br />1 <br />Install City Furnished Type 332 Cabinet on New <br />Foundation 2-4 phases) <br />1 <br />EA <br />2 <br />Install City Furnished Type 332 Cabinet on Existing <br />Foundation (2-4 phases) <br />1 <br />EA <br />3 <br />Install City Furnished Type 332 Cabinet on New <br />Foundation 4-8 phases)1 <br />EA <br />4 <br />Install City Finished Type 332 Cabinet on Existing <br />Foundation (4-8 phases) <br />1 <br />EA <br />5 <br />Furnish & Install Tye IA Pole on New Foundation <br />1 <br />EA <br />6 <br />Furnish & Install Tye IA Pole on Existing Foundation <br />1 <br />EA <br />7 <br />Furnish & Install Tye 15TS Pole on New Foundation <br />1 <br />EA <br />8 <br />Furnish & Install Type 15TS Pole on Existing <br />Foundation <br />1 <br />EA <br />9 <br />Furnish & Install 2" Conduit <br />75 <br />LF <br />10 <br />Furnish & Install 3" Conduit <br />too <br />LF <br />11 <br />Furnish & Install 4" Conduit <br />300 <br />LF <br />12 <br />Furnish & Install No. 6 Pull Box <br />10 <br />EA <br />13 <br />Furnish & Install No. 6E Pull Box <br />2 <br />EA <br />14 <br />Furnish & Install Traffic Signal Loop Detector (Type E <br />Loon) <br />10 <br />EA <br />15 <br />Furnish & Install Bicycle Loop Detector (Circular Type <br />D Loop) <br />10 <br />EA <br />16 <br />Furnish & Install Traffic Signal Loop Detector (Type E <br />Loop) <br />20 <br />EA <br />17 <br />Furnish & Install Bicycle Loop Detector (Circular Type <br />D Loop) <br />20 <br />EA <br />18 <br />Furnish & Install Traffic Signal Loop Detector (Type E <br />Loo) <br />60 <br />EA <br />19 <br />Furnish & Install Bicycle Loop Detector (Circular Type <br />D Loop) <br />60 <br />EA <br />City of Santa Ana RFP 21-095 <br />Exhibit Page A1-2 <br />