Laserfiche WebLink
RE -ADVERTISEMENT <br />Each Sample Task Order's work items include, but are not limited to, the following listed below for <br />the Fee Schedule Submittal. Actual Task Order work, if granted, will generally be on a competitive <br />bid, Time and Materials, basis as described in Section I.A. "Nature of Work" in the PUP, in <br />accordance with labor rates for the type of work and material required per Task Order granted <br />and according to the schedule of rates provided as part of this proposal. <br />"The Sample Task Order information provided will primarily be used to compare various <br />proposals." <br />Sample Task Order A - Traffic Signal Items of Work <br />(Assume all work within Paved areas) <br />Bid Item No. 1 — Install City Furnished Type 332 Controller Cabinet on New Foundation (2-4 <br />phases): <br />This work consists of installing a City furnished Type 332 Controller Cabinet for a 2-4 phase operation on a <br />new foundation. Contractor shall perform all needed excavations, and furnish all materials needed to install <br />Type 332 Controller Cabinet and shall include but not be limited to, concrete foundation, conduit, concrete <br />restoration, installing and re -connecting all field wiring, traffic control and traffic signal tum-on support per <br />latest Caltrans Standards, City of Santa Ana Specifications and as indicated on plans. <br />City will furnish and install traffic signal controller and provide technical turn -on support including <br />traffic signal timing. <br />The lump sum price bid to Install City Furnished Type 332 Cabinet shall include full compensation for <br />furnishing all labor, materials, tools, equipment, paving and appurtenances for all related items of work <br />necessary for the installation. No additional compensation will be allowed therefore. <br />Bid Item No. 2 — Install City Furnished Type 332 Controller Cabinet on Existing Foundation (2-4 <br />phases): <br />This work consists of installing a City furnished Type 332 Controller Cabinet for a 2-4 phase operation on an <br />existing foundation. Contractor shall furnish all materials needed to install Type 332 Controller Cabinet <br />and shall include but not be limited to, installing and re -connecting all field wiring, traffic control and traffic <br />signal turn -on support per latest Caltrans Standards, City of Santa Ana Specifications and as indicated on <br />plans. <br />City will furnish and install traffic signal controller and provide technical turn -on support including <br />traffic signal timing. <br />The lump sum price bid to Install City Furnished Type 332 Cabinet shall include full compensation for <br />furnishing all labor, materials, tools, equipment, and appurtenances for all related items of work <br />necessary for the installation. No additional compensation will be allowed therefore. <br />City of Santa Ana RFP 21-095 <br />Exhibit Page A1-6 <br />