Laserfiche WebLink
RE -ADVERTISEMENT <br />Sample Task Order C - Wheelchair Ramp Items of Work <br />Item No. I - Unclassified Excavation <br />Payment for Unclassified Excavation shall be at the contract unit price per Cubic Yard listed in the Fee <br />Proposal, and shall include full compensation for doing all work, including furnishing all materials, labor, <br />equipment, tools, and incidentals as required and no additional compensation will be allowed therefore. <br />Payment for unclassified fill, if any, is considered as included in the unit price paid for unclassified <br />excavation. <br />Payment for over -excavation shall be paid for at the unit price for unclassified excavation. <br />Item No. 2 - PCC Sidewalk (T=4") <br />The work under this item consists of grading, compacting subgrade, and constructing 4-inch thick PCC <br />Sidewalk in accordance with the provisions of Section 301-1, "Subgrade Preparation," and Section 303-5, <br />"Concrete Curbs, Walks, Gutters, Cross Gutters, Alley Intersections, Access Ramps, and Driveways," of the <br />Standard Specifications, plans, and contract document specifications. <br />Payment for this item shall be at the contract unit price bid per Square Foot as listed in the Bid Proposal, and <br />shall include full compensation for doing all work, including furnishing all materials, labor, equipment, tools, <br />and incidentals as required and no additional compensation will be allowed therefore. Payment for thickness <br />(T=6") shall be paid 1.5 times the unit price. <br />Item No. 3 - PCC Curb Ramp <br />The work under this item consists of grading, compacting subgrade, and constructing 4-inch thick PCC Curb <br />Ramp including detectable warning surface, curb & gutter in accordance with the provisions of Section 301- <br />1, "Subgrade Preparation," and Section 303-5, "Concrete Curb, Walks, Gutters, Cross Gutters, Alley <br />Intersections, Access Ramps, and Driveways," of the Standard Specifications and contract document <br />specification . <br />Payment for this item shall be at the contract unit price bid per Square Foot as listed in the Bid Proposal, and <br />shall include full compensation for doing all work, including furnishing all materials, labor, equipment, tools, <br />and incidentals as required and no additional compensation will be allowed therefore. <br />Item No. 4 - PCC Curb & Gutter (A-2-8) <br />The work under this item consists of grading, compacting subgrade, and constructing PCC Curb & Gutter in <br />accordance with the provisions of Section 301-1, "Subgrade Preparation," and Section 303-5, "Concrete <br />Curbs, Walks, Gutters, Cross Gutters, Alley Intersections, Access Ramps, and Driveways," of the Standard <br />Specifications, plans, and contract document specifications. <br />Payment for this item shall be at the contract unit price bid per Linear Foot as listed in the Bid Proposal, and <br />shall include full compensation for doing all work, including furnishing all materials, labor, equipment, tools, <br />and incidentals as required and no additional compensation will be allowed therefore. <br />City of Santa Ana RFP 21-095 <br />Exhibit Page Al-13 <br />