Laserfiche WebLink
kF-AD'Vitllti! inSL1`iI <br />QUANTITIES FOR FEE SCHEDULE (UNDER SEPARATE COVER) <br />For the purposes of providing a Fee Schedule based on the below Sample Task Orders, the following work <br />items and quantities are provided. The Fee Schedule in Attachment 5: <br />Each Fee Schedule shall include a schedule of the hourly billing rates for ALL contractor and subcontractor <br />staff and labor personnel. Additionally, for each discipline that a company seeks to be considered, the below <br />table(s) would be completed for the purpose of review of the proposals. For example, if a Contractor is <br />submitting for Traffic Signal and Concrete Paving— Wheel Chair Ramp, Sample Task Orders A and C would <br />be completed as part of the Fee Schedule by filling in of the last two columns for the relevant sample task <br />orders by category. However, actual work will be paid for as described in Section I.A. "Nature of Work," <br />and according to the schedule of hourly billing rates. Sample Task Orders for Traffic Signal, Street Light and <br />Concrete Paving - Wheel Chair Ramp in public right-of-way related work are, respectively: <br />Sample Task Order A — Traffic Signal <br />Assume all work within Paved areas <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Total <br />I <br />Install City Furnished Type 332 Cabinet on New <br />Foundation 2-4 phases) <br />1 <br />EA <br />OC)O <br />GOO <br />2 <br />Install City Furnished Type 332 Cabinet on Existing <br />Foundation 2-4 phases) <br />I <br />EA <br />2SUo <br />21007U <br />3 <br />Install City Furnished Type 332 Cabinet on New <br />Foundation 4-8phases) <br />1 <br />EA <br />r0066 <br />rI(J <br />4 <br />Install City Furnished Type 332 Cabinet on Existing <br />Foundation 4-8phases) <br />I <br />EA <br />2ra(a0 <br />21EXbo <br />5 <br />Furnish & Install j1pe 1 A Pole on New Foundation <br />1 <br />EA <br />-?bob <br />-1000 <br />6 <br />Furnish & Install Type lA Pole on Existing Foundation <br />I <br />EA <br />3,loo <br />`'a4C70 <br />7 <br />Furnish & Install Type 15TS Pole on New Foundation <br />I <br />EA <br />10 q00 <br />I Og 00 <br />9 <br />Furnish & Install Type 15TS Pole on Existing <br />Foundation <br />I <br />EA <br />-7400 <br />-14M <br />9 <br />Furnish & Install 2" Conduit <br />75 <br />LF <br />L(G <br />%S-1E5 <br />10 <br />Furnish & Install 3" Conduit <br />10o <br />LF <br />SS <br />a <br />I I <br />Furnish & Install 4" Conduit <br />300 <br />LF <br />Lis <br />('J) <br />12 <br />Furnish & Install No. 6 Pull Box <br />10 <br />EA <br />7U0 <br />'7000 <br />13 <br />Furnish & Install No. 6E Pull Box <br />2 <br />EA <br />50 <br />1'TC0 <br />14 <br />Furnish & Install Traffic Signal Loop Detector (Type E <br />Loon) <br />1p <br />EA <br />2(00 <br />2f2 (7U <br />IS <br />Furnish & Install Bicycle Loop Detector (Circular Type <br />DLoo) <br />10 <br />EA <br />2(PO <br />2(00c) <br />16 <br />Furnish & Install Traffic Signal Loop Detector (Type E <br />Loop) <br />20 <br />EA <br />2 (co <br />Eau) <br />17 <br />Furnish & Install Bicycle Loop Detector (Circular Type <br />D Loop) <br />20 <br />EA <br />2W <br />6160 <br />18 <br />Furnish & Install Traffic Signal Loop Detector (Type E <br />Loop) <br />60 <br />EA <br />240 <br />151EfX7 <br />19 <br />Furnish & Install Bicycle Loop Detector (Circular Tl pe <br />DLoo <br />60 <br />EA <br />2(d0 <br />Cdy of Santa Ana RFP 21-095 <br />Exhibit Page Al-2 <br />