My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CALIFORNIA PROFESSIONAL ENGINEERING, INC (2)
Clerk
>
Contracts / Agreements
>
C
>
CALIFORNIA PROFESSIONAL ENGINEERING, INC (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2022 10:21:18 AM
Creation date
9/12/2022 10:17:49 AM
Metadata
Fields
Template:
Contracts
Company Name
CALIFORNIA PROFESSIONAL ENGINEERING, INC
Contract #
A-2022-157-02
Agency
Public Works
Council Approval Date
8/16/2022
Expiration Date
6/30/2025
Insurance Exp Date
5/19/2023
Destruction Year
2030
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
P ,.:) ;i:I :I:. a';ij- . <br />7 <br />PCC Cross Gutter (C.O.S.A. Std. Plan 1109) <br />Soo <br />SF <br />`70 <br />8 <br />] 8" Deep Polyethylene Root Barrier (CA.S.A. Std. <br />50 <br />LF <br />�jrJl <br />1"16E�U <br />Plan 1124 & 1124B) <br />9 <br />Root Shaving (C.O.S.A. Std. Plan 1124A) <br />6 <br />EA <br />Z?r�U <br />1't(JtPO <br />SURETY BOND <br />For each Task Order Issued by Public Works Agency, the City may or may not require the Contractor to <br />provide cash deposit or surety "Payment" and "Performance" bond. Depending upon the size, nature <br />and risk of the work, the City may use the amounts specified by the "Greenbook," surface drainage or <br />street improvement plan measurements, or the approved itemized cost for each On -call or Emergency <br />Task Order to calculate bond amounts, if any. Task Order work shall be per the City's Standard Plans, <br />As -Built Plans, or other direction from the Public Works Agency. If required for a Task Order, the cash <br />deposit or the surety bonds shall guarantee the construction of all necessary improvements for the Task <br />Order, however. Bid Bonds were not rea uired at the time of the submittal of RTP Proposal. For Task <br />Orders, the City also reserves the right to retain 10% of progress pay amounts for the one-year warranty <br />work. If so, the cash deposit shall be released approximately 135 days after all related permits and/or <br />other approvals required are signed off by the City's Construction Inspector, and the passage of any lien <br />periods. In the event the work is not completed within one year of the date that a street work permit or <br />Task Order is signed, applicant agrees that the City may apply the cash deposit to the cost of completing <br />the work and such work may be completed at the sole convenience of the City of Santa Ana. <br />Contractor must be able to respond to City's request for emergency repair work on a timely and urgent <br />manner. The contractor shall be available on an on -call basis, 24/7, and ready to respond in the event <br />of an emergency. Service calls shall be responded within one hour. Contractor's repair crews must <br />be able to arrive at job site within 8 hours of approval from City to commence work. Regular <br />business hours are considered from 7:00 am to 5:00 pm (Monday through Friday). Anytime outside of <br />business hours of operation may be considered after hours/weekends. <br />The Contractor shall, prior to award of contract and without additional expense to the City, possess all <br />licenses and permits (unless waived by the City) required for the performance of the work required by this <br />contract, including but not limited to a California Class (A or C-10) Contractor's license and a City of <br />Santa Ana Business License. <br />1. Street work shall be required to be performed by a licensed contractor for any and all the work in the <br />public right of way. The contractor must provide the following prior to initiating Task Order work. <br />a. A City of Santa Ana business license, <br />b. A Certificate of Insurance of general liability containing requirements as set forth by the City <br />Attorney and per the Standard Agreement. <br />c. A Contractors license (with appropriate classification). <br />d. Proof of Worker's Compensation Insurance. <br />City of Santa Ana RFP 21-095 <br />Exhibit Page A14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.