My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2022-09-20
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
09/20/2022 Special and Regular
>
Agenda Packet_2022-09-20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2022 3:29:02 PM
Creation date
9/19/2022 2:54:21 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
9/20/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
639
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CJMNS <br />Client Los Angeles Department of Water and Power <br />Contact Terrence McCarthy, Contract Administrator <br />213.367.0925 1 terrence.mccarthy@ladwp.com <br />Dates of Service 06/2018 - 02/2019 <br />Personnel Greg Jaquez <br />$232.6M MNS collaborated with LADWP staff and their consultant design team to prepare <br />Awarded two grant applications for the North Hollywood Central Groundwater Remediation <br />fl= <br />�i Project and the Tujunga Groundwater Remediation Project, respectively. Highly <br />technical study documents were interpreted for use in responding to grant <br />application requirements. MNS also prepared project scheduling documents to <br />correspond to grant program requirements. The two projects are part of a historic <br />multi -year effort to remediate contamination in the San Fernando Groundwater <br />Basin. WRFP application to the State Water Resources Control Board. <br />Client City of Rolling Hills <br />Contact Elaine Jeng, City Manager <br />310.377.1521 1 ejeng@cityofrh.net <br />Dates of Service 03/2019 - 10/2019 <br />Personnel Greg Jaquez, Monica Killen <br />$2,gM MNS prepared a set of three Hazard Mitigation Grant (HMG) applications for a <br />Awarded Wildfire Protection Plan, the Eastfield Drive Utility Undergrounding Project, and the <br />�i Wildfire Fuel Breaks Project. <br />Wildfire Protection Plan (WPP). In addition to preparing narratives for application <br />forms and attachments, MNS developed the scope description for the WPP, cost <br />estimate breakdown for plan development, and delivery plan to complete the <br />WPP through public outreach and interjurisdictional coordination. <br />Eastfield Drive Utility Undergrounding Project. In addition to preparing narratives <br />for application forms and attachments, MNS collaborated with an electrical <br />engineering firm to develop the project scope and cost estimate. <br />Fuel Breaks Project. Upon discovering the City's proposed locations to design and <br />construct wildfire fuel breaks were infeasible, MNS reviewed alternate potential <br />City Ca tBciland developed concept plans Q904d43nates for the fuel 1*2akZ022 <br />SECTION 3. RELEVANT EXPERIENCE E <br />
The URL can be used to link to this page
Your browser does not support the video tag.