My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2022-09-20
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
09/20/2022 Special and Regular
>
Agenda Packet_2022-09-20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2022 3:29:02 PM
Creation date
9/19/2022 2:54:21 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
9/20/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
639
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
pursuant to this article may submit an application together with a non-refundable <br />processing fee in an amount established by the City Council. <br />b. The Registration Application period shall be thirty (30) calendar days from the date <br />the applications are released. Following the application period, the Director of <br />Planning and Building or designee(s) shall stop accepting applications and review <br />all applications received in Phase 1. Each application that is complete and in <br />compliance with the application requirements in Phase 1 shall be plaGed on th - <br />"RSP Eligibility Lost" and shall be notified in writing whether they are a "RSP Eligible <br />Applicant" or not. Each complete and compliant applicant on the RSP Eligibility <br />List may then choose to file an application for a RSP in Phase 2. <br />c. The requirements for Phase 1 include, but are not limited to: <br />i. All application documents required in the City's Phase 1 Registration <br />Application package. <br />ii. Application was submitted during the application period. <br />iii. Application forms are filled out completely. <br />iv. Phase 1 application fee is paid. <br />V. A signed statement that the proposed location of the commercial cannabis <br />business on the application meets the zoning criteria established in this article <br />including, but not limited to, any and all sensitive use separation criteria <br />required by this article. <br />vi. Proof of site control for commercial cannabis retail businesses submitting <br />Phase 1 applications on or after July 1, 2018. <br />d. The Director of PlanRiRg and BuildiRg er his or her desigRee(s) shall determine <br />whether each application demonstrates GOMpliance with the MiRiMl <br />requi—n—ts (above) and be plaGed on the RSP Eligibility Lost and entered <br />the Dhow `i application and review PrOGesc <br />{e}d. The Director of Planning and Building or his or her designee(s) shall review <br />each application upon submission and ensure that the application is complete. <br />Incomplete applications will be promptly rejected and the applicant shall be notified <br />in writing of the deficiencies. The applicant shall be given an opportunity to cure <br />any incomplete or deficient application prior to the conclusion of the application <br />processing term, if such time period is applicable. <br />3. Phase 2 — Regulatory Safety Permit Application. <br />a. Each complete and compliant applicant identified ^^ the RSP Eligibility Lost may <br />choose to complete and file a RSP application to the Director of Planning and <br />Building. The application shall be filed together with a nonrefundable fee as <br />Ordinance No. NS-XXX <br />Page 31 of 66 <br />City Council 25 — 46 9/20/2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.