Laserfiche WebLink
Exhibit A <br />August 31st, 2022 <br />Contact Name: Julie Castro -Cardenas <br />Title: Economic Development Specialist II <br />Client Name: City of Santa Ana <br />Email: jcastro-cardenas@santa-ana.org <br />Phone: (714) 647-6585 <br />City of Santa Ana Overstreet 4th Street Lighting <br />Proposal 2022 <br />V1 <br />"PROPOSAL' <br />Purchase and Installation of lighting Decorations <br />SUMMARY REPORT: <br />- Overstreet Lighting Down 4" street from Sycamore to French St. <br />- Bistro Style Lighting. <br />- Reference Images/Concepts at the bottom of document. <br />DETAILED REPORT: <br />Overstreet Liehtin <br />Product to be used: <br />Overhead Lighting: Warm White Bistro Style Lights <br />- Approximately Thirteen Hundred (1,300) feet Medium Base E26 Socket Set SPT2 16Ga Black Wire, 8' Lead wire, 24" Spacing, <br />Non -End Connecting Outdoor Use <br />- Approximately Six Hundred Fifty (650) S14 LED Warm White Faceted Replacement Bulb E26 Nickel Base, 10 Diodes, 120V <br />Dimmable <br />- Installation of guide wire cable attached to Santa Ana Double Cobra Light Poles. Written Permission pending from City. <br />Using turnbuckles and U-Clamps. <br />- Lights will be installed in a zig zag pattern. <br />- Please note: Exact power structure is unknown. Each light strand will tap into the current client power infrastructure. Water <br />sealant silicone used at each cable entry point entering the building for power. <br />Location: 4th Street <br />4`h Street — From Sycamore St. to French St. <br />- Approximately Thirteen Hundred (1,300) feet Medium Base E26 Socket Set SPT2 16Ga Black Wire, 8' Lead wire, 24" Spacing, <br />Non -End Connecting Outdoor Use in a zig zag pattern. <br />- Approximately Six Hundred Fifty (650) 514 LED Warm White Faceted Replacement Bulb E26 Nickel Base, 10 Diodes, 120V <br />Dimmable <br />Lights will be installed in a zig zag pattern. <br />Lights Attached to Double Cobra Light Posts Down 4`h Street. <br />Total Cost $45,550.00 <br />Amount Due upon Acceptance of Proposal $22,750.00 <br />Amount Due Prior to Installation Commencing $22,750.00 <br />Total $45,550:00 <br />BrightLife Designs LLC <br />16351 Gothard St, STE C, Huntington Beach, CA 92647 <br />Phone: 714-326-8326; Direct : 714-372-2274 <br />www.Brightlifedesigns.com <br />